Skip to main content
RateWatt

Solar power plant, California

Daggett 2 solar power plant, California

Daggett 2 is a 313 MW power plant, 182 MW of it solar, in San Bernardino County, California, operated by Daggett Solar Power 2 LLC, and it generated 518,910 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in California, and its capacity factor sits at the 99th percentile of U.S. solar plants. By 2025 generation it ranks 1,304th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

313 MWNameplate capacity
34%Capacity factor, 2025, solar units, 99th percentile, on 182 MW net summer
0.3%Of CA generation, 2025
2 yearsAverage generator age, by MW

How hard does the Daggett 2 plant run compared with other solar plants?

The Daggett 2 plant's solar units had a capacity factor of 34% in 2025 on 182 MW of net summer capacity, the 99th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 124 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Daggett 234%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Daggett 2 plant generating more or less than last year?

Generation at Daggett 2 fell 1.9% from 2024 to 2025, from 529,015 MWh to 518,910 MWh. Through August 2026 it is running 9.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024529,015
2025518,910
2026 through August341,459
2025, same months378,192
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202646,198
July 202652,040
June 202649,066
May 202647,445
April 202640,983
March 202644,584
February 202631,967
January 202629,176
December 202526,602
November 202527,783
October 202542,684
September 202543,649
August 202550,164
July 202559,677
June 202559,378
May 202556,517
April 202551,306
March 202537,050
February 202531,895
January 202532,205
December 202426,522
November 202434,824
October 202443,954
September 202450,050
August 202457,488
July 202455,156
June 202458,056
May 202459,153
April 202451,578
March 202438,153
February 202428,811
January 202425,270

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Daggett 2 plant?

Daggett 2 made 0.3% of the 204,542,898 MWh reported by California plants in 2025, from 0.3% of the state's 107,433 MW of capacity. By capacity it is the 70th largest of 1,877 plants in California, the 999th largest of 14,327 in the U.S. and the 210th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 79th largest of 1,608 generating plants in the state.

Daggett 2 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)313107,4330.3%
Generation (MWh)518,910204,542,8980.3%
Solar capacity (MW)18224,6630.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Daggett 2 plant, and when do they retire?

2 operable generators total 313 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2313100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
DAGGBOperatingBatteries1312023n/a
DAGGPOperatingSolar Photovoltaic1822023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Daggett 2 plant?

EIA lists no joint owners for Daggett 2. Daggett Solar Power 2 LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Daggett 2 plant use?

Daggett 2 has capacity on 2 fuels: 58% solar and 42% battery and pumped storage. In 2025, solar made 104% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar18258.1%539,807
Battery and pumped storage13141.9%-20,897

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Daggett 2 plant?

Daggett 2 is in Daggett, San Bernardino County, California, at 34.8609° N, 116.8553° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Daggett 2's 182 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Golden Field Solar III, LLCKern192548,125
ProximaStanislaus190485,617
RE GarlandKern185521,659
Daggett 2San Bernardino182539,807
Centinela Solar EnergyImperial175448,552
Chaparral SpringsKern174425,521
Solar Gen 2 Solar FacilityImperial163376,661

Source: EIA Forms EIA-860 and EIA-923, 2025.