Centinela Solar Energy is a 175 MW solar power plant in Imperial County, California, operated by Centinela Solar Energy LLC, and it generated 448,552 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 91st percentile of U.S. solar plants. By 2025 generation it ranks 1,458th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

175 MWNameplate capacity
30%Capacity factor, 2025, 91st percentile, on 170 MW net summer
0.2%Of CA generation, 2025
12 yearsAverage generator age, by MW

How hard does the Centinela Solar Energy plant run compared with other solar plants?

The Centinela Solar Energy plant had a capacity factor of 30% in 2025 on 170 MW of net summer capacity, the 91st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 110 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Centinela Solar Energy30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Centinela Solar Energy plant generating more or less than last year?

Generation at Centinela Solar Energy rose 27.2% from 2024 to 2025, from 352,741 MWh to 448,552 MWh.

Net generation by period
PeriodMWh
2024352,741
2025448,552
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202525,740
November 202526,596
October 202537,140
September 202538,174
August 202543,709
July 202551,627
June 202550,253
May 202545,152
April 202540,453
March 202532,017
February 202528,785
January 202528,906
December 202419,811
November 202422,748
October 202428,636
September 202433,248
August 202436,059
July 202437,852
June 202440,368
May 202435,620
April 202428,347
March 202426,142
February 202423,010
January 202420,900

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Centinela Solar Energy plant?

Centinela Solar Energy made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 150th largest of 1,877 plants in California, the 1,791st largest of 14,327 in the U.S. and the 227th largest of 7,223 solar plants. By 2025 generation it is the 95th largest of 1,608 generating plants in the state.

Centinela Solar Energy within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)175107,4330.2%
Generation (MWh)448,552204,542,8980.2%
Solar capacity (MW)17524,6630.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Centinela Solar Energy plant, and when do they retire?

6 operable generators total 175 MW, with an average age of 12 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s6175100%none reported
Every generator, 6 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CSE1OperatingSolar Photovoltaic342013n/a
CSE2OperatingSolar Photovoltaic272013n/a
CSE3OperatingSolar Photovoltaic342013n/a
CSE4OperatingSolar Photovoltaic342013n/a
CSE5OperatingSolar Photovoltaic192014n/a
CSE6OperatingSolar Photovoltaic272014n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Centinela Solar Energy plant?

EIA lists no joint owners for Centinela Solar Energy. Centinela Solar Energy LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Centinela Solar Energy plant?

Centinela Solar Energy is in Calexico, Imperial County, California, at 32.6869° N, 115.6478° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Centinela Solar Energy's 175 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
ProximaStanislaus190485,617
RE GarlandKern185521,659
Daggett 2San Bernardino182539,807
Centinela Solar EnergyImperial175448,552
Chaparral SpringsKern174425,521
Solar Gen 2 Solar FacilityImperial163376,661
Rancho Seco Solar II, LLCSacramento160275,130

Source: EIA Forms EIA-860 and EIA-923, 2025.