Solar power plant, California
Centinela Solar Energy power plant, California
Centinela Solar Energy is a 175 MW solar power plant in Imperial County, California, operated by Centinela Solar Energy LLC, and it generated 448,552 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 91st percentile of U.S. solar plants. By 2025 generation it ranks 1,458th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Centinela Solar Energy plant run compared with other solar plants?
The Centinela Solar Energy plant had a capacity factor of 30% in 2025 on 170 MW of net summer capacity, the 91st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 110 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Centinela Solar Energy | 30% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Centinela Solar Energy plant generating more or less than last year?
Generation at Centinela Solar Energy rose 27.2% from 2024 to 2025, from 352,741 MWh to 448,552 MWh.
| Period | MWh |
|---|---|
| 2024 | 352,741 |
| 2025 | 448,552 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 25,740 |
| November 2025 | 26,596 |
| October 2025 | 37,140 |
| September 2025 | 38,174 |
| August 2025 | 43,709 |
| July 2025 | 51,627 |
| June 2025 | 50,253 |
| May 2025 | 45,152 |
| April 2025 | 40,453 |
| March 2025 | 32,017 |
| February 2025 | 28,785 |
| January 2025 | 28,906 |
| December 2024 | 19,811 |
| November 2024 | 22,748 |
| October 2024 | 28,636 |
| September 2024 | 33,248 |
| August 2024 | 36,059 |
| July 2024 | 37,852 |
| June 2024 | 40,368 |
| May 2024 | 35,620 |
| April 2024 | 28,347 |
| March 2024 | 26,142 |
| February 2024 | 23,010 |
| January 2024 | 20,900 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Centinela Solar Energy plant, and when do they retire?
6 operable generators total 175 MW, with an average age of 12 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 6 | 175 | 100% | none reported |
Every generator, 6 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CSE1 | Operating | Solar Photovoltaic | 34 | 2013 | n/a |
| CSE2 | Operating | Solar Photovoltaic | 27 | 2013 | n/a |
| CSE3 | Operating | Solar Photovoltaic | 34 | 2013 | n/a |
| CSE4 | Operating | Solar Photovoltaic | 34 | 2013 | n/a |
| CSE5 | Operating | Solar Photovoltaic | 19 | 2014 | n/a |
| CSE6 | Operating | Solar Photovoltaic | 27 | 2014 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Centinela Solar Energy plant?
EIA lists no joint owners for Centinela Solar Energy. Centinela Solar Energy LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Centinela Solar Energy plant?
Centinela Solar Energy is in Calexico, Imperial County, California, at 32.6869° N, 115.6478° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Centinela Solar Energy's 175 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Proxima | Stanislaus | 190 | 485,617 |
| RE Garland | Kern | 185 | 521,659 |
| Daggett 2 | San Bernardino | 182 | 539,807 |
| Centinela Solar Energy | Imperial | 175 | 448,552 |
| Chaparral Springs | Kern | 174 | 425,521 |
| Solar Gen 2 Solar Facility | Imperial | 163 | 376,661 |
| Rancho Seco Solar II, LLC | Sacramento | 160 | 275,130 |
Source: EIA Forms EIA-860 and EIA-923, 2025.