Rancho Seco Solar II, LLC power plant, California

Rancho Seco Solar II, LLC is a 160 MW solar power plant in Sacramento County, California, operated by Rancho Seco Solar II, LLC, and it generated 275,130 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 24th percentile of U.S. solar plants. By 2025 generation it ranks 2,083rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

160 MWNameplate capacity
20%Capacity factor, 2025, 24th percentile, on 160 MW net summer
0.1%Of CA generation, 2025
4 yearsAverage generator age, by MW

How hard does the Rancho Seco Solar II, LLC plant run compared with other solar plants?

The Rancho Seco Solar II, LLC plant had a capacity factor of 20% in 2025 on 160 MW of net summer capacity, the 24th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 72 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Rancho Seco Solar II, LLC20%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Rancho Seco Solar II, LLC plant generating more or less than last year?

Generation at Rancho Seco Solar II, LLC fell 6.7% from 2024 to 2025, from 294,797 MWh to 275,130 MWh. Through August 2026 it is running 2.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024294,797
2025275,130
2026 through August216,022
2025, same months221,882
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202632,345
July 202633,515
June 202636,243
May 202633,504
April 202622,588
March 202629,059
February 202616,114
January 202612,654
December 20254,785
November 202510,256
October 202515,612
September 202522,595
August 202530,743
July 202534,459
June 202530,039
May 202538,195
April 202531,361
March 202524,407
February 202516,354
January 202516,324
December 202410,028
November 202415,435
October 202423,890
September 202430,509
August 202434,376
July 202435,924
June 202434,007
May 202434,609
April 202429,690
March 202425,278
February 202415,331
January 20245,720

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Rancho Seco Solar II, LLC plant?

Rancho Seco Solar II, LLC made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. By capacity it is the 170th largest of 1,877 plants in California, the 1,900th largest of 14,327 in the U.S. and the 242nd largest of 7,223 solar plants. By 2025 generation it is the 194th largest of 1,608 generating plants in the state.

Rancho Seco Solar II, LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)160107,4330.1%
Generation (MWh)275,130204,542,8980.1%
Solar capacity (MW)16024,6630.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Rancho Seco Solar II, LLC plant, and when do they retire?

1 operable generator totals 160 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1160100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
RSS2OperatingSolar Photovoltaic1602021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Rancho Seco Solar II, LLC plant?

EIA lists no joint owners for Rancho Seco Solar II, LLC. Rancho Seco Solar II, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Rancho Seco Solar II, LLC plant?

Rancho Seco Solar II, LLC is in Twin Cities, Sacramento County, California, at 38.3468° N, 121.1198° W. It sits in the Balancing Authority of Northern California balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Rancho Seco Solar II, LLC's 160 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Centinela Solar EnergyImperial175448,552
Chaparral SpringsKern174425,521
Solar Gen 2 Solar FacilityImperial163376,661
Rancho Seco Solar II, LLCSacramento160275,130
Springbok Solar Farm 2Kern155397,111
Edwards Sanborn E1BKern154371,792
Mount Signal Solar Farm IIImperial154402,547

Source: EIA Forms EIA-860 and EIA-923, 2025.