Skip to main content
RateWatt

Solar power plant, California

Edwards Sanborn E1B solar power plant, California

Edwards Sanborn E1B is a 290 MW power plant, 154 MW of it solar, in Kern County, California, operated by Terra-Gen Operating Co-Hybrid, and it generated 354,722 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 80th percentile of U.S. solar plants. By 2025 generation it ranks 1,756th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

290 MWNameplate capacity
27%Capacity factor, 2025, solar units, 80th percentile, on 154 MW net summer
0.2%Of CA generation, 2025
3 yearsAverage generator age, by MW

How hard does the Edwards Sanborn E1B plant run compared with other solar plants?

The Edwards Sanborn E1B plant's solar units had a capacity factor of 27% in 2025 on 154 MW of net summer capacity, the 80th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 100 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Edwards Sanborn E1B27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Edwards Sanborn E1B plant generating more or less than last year?

Generation at Edwards Sanborn E1B rose 4.7% from 2024 to 2025, from 338,809 MWh to 354,722 MWh. Through August 2026 it is running 2.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024338,809
2025354,722
2026 through August258,079
2025, same months264,902
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202636,442
July 202636,072
June 202642,222
May 202640,852
April 202635,638
March 202630,925
February 202619,127
January 202616,801
December 202515,034
November 202515,923
October 202527,699
September 202531,164
August 202537,410
July 202543,224
June 202540,607
May 202539,431
April 202536,526
March 202528,544
February 202520,208
January 202518,952
December 202414,238
November 202418,583
October 202426,479
September 202430,567
August 202438,203
July 202438,982
June 202440,544
May 202441,093
April 202432,197
March 202424,760
February 202417,982
January 202415,181

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Edwards Sanborn E1B plant?

Edwards Sanborn E1B made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.3% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 79th largest of 1,877 plants in California, the 1,113th largest of 14,327 in the U.S. and the 248th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 140th largest of 1,608 generating plants in the state.

Edwards Sanborn E1B within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)290107,4330.3%
Generation (MWh)354,722204,542,8980.2%
Solar capacity (MW)15424,6630.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Edwards Sanborn E1B plant, and when do they retire?

2 operable generators total 290 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2290100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PVOperatingSolar Photovoltaic1542022n/a
BESSOperatingBatteries1362023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Edwards Sanborn E1B plant?

EdSan 1B Group 1 Sanborn, LLC is the only joint owner reported for Edwards Sanborn E1B, with 100.0%. Terra-Gen Operating Co-Hybrid operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Edwards Sanborn E1B plant use?

Edwards Sanborn E1B has capacity on 2 fuels: 53% solar and 47% battery and pumped storage. In 2025, solar made 105% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar15453.2%371,792
Battery and pumped storage13646.8%-17,070

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Edwards Sanborn E1B plant?

Edwards Sanborn E1B is in Mojave, Kern County, California, at 34.9640° N, 118.0941° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Edwards Sanborn E1B's 154 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Solar Gen 2 Solar FacilityImperial163376,661
Rancho Seco Solar II, LLCSacramento160275,130
Springbok Solar Farm 2Kern155397,111
Edwards Sanborn E1BKern154371,792
Mount Signal Solar Farm IIImperial154402,547
North Rosamond Solar LLCKern151397,173
ChestnutKings151403,005

Source: EIA Forms EIA-860 and EIA-923, 2025.