Springbok Solar Farm 2 power plant, California

Springbok Solar Farm 2 is a 155 MW solar power plant in Kern County, California, operated by 63SU 8me, LLC, and it generated 397,111 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 88th percentile of U.S. solar plants. By 2025 generation it ranks 1,597th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

155 MWNameplate capacity
29%Capacity factor, 2025, 88th percentile, on 155 MW net summer
0.2%Of CA generation, 2025
9 yearsAverage generator age, by MW

How hard does the Springbok Solar Farm 2 plant run compared with other solar plants?

The Springbok Solar Farm 2 plant had a capacity factor of 29% in 2025 on 155 MW of net summer capacity, the 88th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 107 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Springbok Solar Farm 229%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Springbok Solar Farm 2 plant generating more or less than last year?

Generation at Springbok Solar Farm 2 fell 0.5% from 2024 to 2025, from 399,005 MWh to 397,111 MWh.

Net generation by period
PeriodMWh
2024399,005
2025397,111
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202517,742
November 202518,144
October 202531,041
September 202533,448
August 202539,242
July 202544,536
June 202547,044
May 202545,939
April 202541,937
March 202534,564
February 202521,865
January 202521,609
December 202418,674
November 202422,796
October 202430,258
September 202435,467
August 202441,761
July 202442,139
June 202444,894
May 202446,381
April 202441,492
March 202432,324
February 202422,555
January 202420,264

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Springbok Solar Farm 2 plant?

Springbok Solar Farm 2 made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 172nd largest of 1,877 plants in California, the 1,928th largest of 14,327 in the U.S. and the 247th largest of 7,223 solar plants. By 2025 generation it is the 114th largest of 1,608 generating plants in the state.

Springbok Solar Farm 2 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)155107,4330.1%
Generation (MWh)397,111204,542,8980.2%
Solar capacity (MW)15524,6630.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Springbok Solar Farm 2 plant, and when do they retire?

1 operable generator totals 155 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1155100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
SB2OperatingSolar Photovoltaic1552016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Springbok Solar Farm 2 plant?

EIA lists no joint owners for Springbok Solar Farm 2. 63SU 8me, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Springbok Solar Farm 2 plant?

Springbok Solar Farm 2 is in Cantil, Kern County, California, at 35.2500° N, 117.9768° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Springbok Solar Farm 2's 155 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Chaparral SpringsKern174425,521
Solar Gen 2 Solar FacilityImperial163376,661
Rancho Seco Solar II, LLCSacramento160275,130
Springbok Solar Farm 2Kern155397,111
Edwards Sanborn E1BKern154371,792
Mount Signal Solar Farm IIImperial154402,547
North Rosamond Solar LLCKern151397,173