Solar power plant, California
Springbok Solar Farm 2 power plant, California
Springbok Solar Farm 2 is a 155 MW solar power plant in Kern County, California, operated by 63SU 8me, LLC, and it generated 397,111 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 88th percentile of U.S. solar plants. By 2025 generation it ranks 1,597th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Springbok Solar Farm 2 plant run compared with other solar plants?
The Springbok Solar Farm 2 plant had a capacity factor of 29% in 2025 on 155 MW of net summer capacity, the 88th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 107 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Springbok Solar Farm 2 | 29% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Springbok Solar Farm 2 plant generating more or less than last year?
Generation at Springbok Solar Farm 2 fell 0.5% from 2024 to 2025, from 399,005 MWh to 397,111 MWh.
| Period | MWh |
|---|---|
| 2024 | 399,005 |
| 2025 | 397,111 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 17,742 |
| November 2025 | 18,144 |
| October 2025 | 31,041 |
| September 2025 | 33,448 |
| August 2025 | 39,242 |
| July 2025 | 44,536 |
| June 2025 | 47,044 |
| May 2025 | 45,939 |
| April 2025 | 41,937 |
| March 2025 | 34,564 |
| February 2025 | 21,865 |
| January 2025 | 21,609 |
| December 2024 | 18,674 |
| November 2024 | 22,796 |
| October 2024 | 30,258 |
| September 2024 | 35,467 |
| August 2024 | 41,761 |
| July 2024 | 42,139 |
| June 2024 | 44,894 |
| May 2024 | 46,381 |
| April 2024 | 41,492 |
| March 2024 | 32,324 |
| February 2024 | 22,555 |
| January 2024 | 20,264 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Springbok Solar Farm 2 plant, and when do they retire?
1 operable generator totals 155 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 155 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SB2 | Operating | Solar Photovoltaic | 155 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Springbok Solar Farm 2 plant?
EIA lists no joint owners for Springbok Solar Farm 2. 63SU 8me, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Springbok Solar Farm 2 plant?
Springbok Solar Farm 2 is in Cantil, Kern County, California, at 35.2500° N, 117.9768° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Springbok Solar Farm 2's 155 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Chaparral Springs | Kern | 174 | 425,521 |
| Solar Gen 2 Solar Facility | Imperial | 163 | 376,661 |
| Rancho Seco Solar II, LLC | Sacramento | 160 | 275,130 |
| Springbok Solar Farm 2 | Kern | 155 | 397,111 |
| Edwards Sanborn E1B | Kern | 154 | 371,792 |
| Mount Signal Solar Farm II | Imperial | 154 | 402,547 |
| North Rosamond Solar LLC | Kern | 151 | 397,173 |
Source: EIA Forms EIA-860 and EIA-923, 2025.