Solar power plant, California
Solar Gen 2 Solar Facility, California
Solar Gen 2 Solar Facility is a 163 MW solar power plant in Imperial County, California, operated by Southern Power Co, and it generated 376,661 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 85th percentile of U.S. solar plants. By 2025 generation it ranks 1,668th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Solar Gen 2 Solar Facility plant run compared with other solar plants?
The Solar Gen 2 Solar Facility plant had a capacity factor of 29% in 2025 on 150 MW of net summer capacity, the 85th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 105 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Solar Gen 2 Solar Facility | 29% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Solar Gen 2 Solar Facility plant generating more or less than last year?
Generation at Solar Gen 2 Solar Facility rose 3.4% from 2024 to 2025, from 364,207 MWh to 376,661 MWh.
| Period | MWh |
|---|---|
| 2024 | 364,207 |
| 2025 | 376,661 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 18,411 |
| November 2025 | 19,945 |
| October 2025 | 30,854 |
| September 2025 | 33,453 |
| August 2025 | 37,552 |
| July 2025 | 42,355 |
| June 2025 | 41,841 |
| May 2025 | 39,157 |
| April 2025 | 39,414 |
| March 2025 | 29,849 |
| February 2025 | 23,523 |
| January 2025 | 20,307 |
| December 2024 | 17,586 |
| November 2024 | 16,424 |
| October 2024 | 28,185 |
| September 2024 | 33,155 |
| August 2024 | 38,040 |
| July 2024 | 41,004 |
| June 2024 | 43,198 |
| May 2024 | 43,695 |
| April 2024 | 33,710 |
| March 2024 | 26,125 |
| February 2024 | 24,998 |
| January 2024 | 18,087 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Solar Gen 2 Solar Facility plant, and when do they retire?
3 operable generators total 163 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 3 | 163 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| ALHM | Operating | Solar Photovoltaic | 54 | 2014 | n/a |
| ARK | Operating | Solar Photovoltaic | 54 | 2014 | n/a |
| SONR | Operating | Solar Photovoltaic | 54 | 2014 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Solar Gen 2 Solar Facility plant?
SG2 Imperial Valley, LLC is the only joint owner reported for Solar Gen 2 Solar Facility, with 100.0%. Southern Power Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Solar Gen 2 Solar Facility plant?
Solar Gen 2 Solar Facility is in Calipatria, Imperial County, California, at 33.0800° N, 115.4700° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Solar Gen 2 Solar Facility's 163 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Daggett 2 | San Bernardino | 182 | 539,807 |
| Centinela Solar Energy | Imperial | 175 | 448,552 |
| Chaparral Springs | Kern | 174 | 425,521 |
| Solar Gen 2 Solar Facility | Imperial | 163 | 376,661 |
| Rancho Seco Solar II, LLC | Sacramento | 160 | 275,130 |
| Springbok Solar Farm 2 | Kern | 155 | 397,111 |
| Edwards Sanborn E1B | Kern | 154 | 371,792 |
Source: EIA Forms EIA-860 and EIA-923, 2025.