Skip to main content
RateWatt

Solar power plant, California

Chestnut solar power plant, California

Chestnut is a 286 MW power plant, 151 MW of it solar, in Kings County, California, operated by Chestnut Westside LLC, and it generated 377,844 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 93rd percentile of U.S. solar plants. By 2025 generation it ranks 1,663rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

286 MWNameplate capacity
31%Capacity factor, 2025, solar units, 93rd percentile, on 151 MW net summer
0.2%Of CA generation, 2025
2 yearsAverage generator age, by MW

How hard does the Chestnut plant run compared with other solar plants?

The Chestnut plant's solar units had a capacity factor of 31% in 2025 on 151 MW of net summer capacity, the 93rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 111 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Chestnut31%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Chestnut plant generating more or less than last year?

Generation at Chestnut rose 3.9% from 2024 to 2025, from 363,836 MWh to 377,844 MWh. Through August 2026 it is running 6.8% behind the same months of 2025.

Net generation by period
PeriodMWh
2024363,836
2025377,844
2026 through August271,087
2025, same months290,806
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202642,739
July 202646,712
June 202642,662
May 202636,309
April 202629,741
March 202635,531
February 202622,361
January 202615,032
December 20255,738
November 202512,821
October 202530,780
September 202537,699
August 202544,574
July 202549,989
June 202549,596
May 202545,501
April 202531,718
March 202526,205
February 202520,420
January 202522,803
December 202414,217
November 202419,797
October 202428,293
September 202435,057
August 202443,020
July 202445,388
June 202442,425
May 202437,180
April 202429,322
March 202419,154
February 202433,908
January 202416,075

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Chestnut plant?

Chestnut made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.3% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 83rd largest of 1,877 plants in California, the 1,128th largest of 14,327 in the U.S. and the 257th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 120th largest of 1,608 generating plants in the state.

Chestnut within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)286107,4330.3%
Generation (MWh)377,844204,542,8980.2%
Solar capacity (MW)15124,6630.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Chestnut plant, and when do they retire?

2 operable generators total 286 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2286100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BESS1OperatingBatteries1352023n/a
CHNUTOperatingSolar Photovoltaic1512023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Chestnut plant?

EIA lists no joint owners for Chestnut. Chestnut Westside LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Chestnut plant use?

Chestnut has capacity on 2 fuels: 53% solar and 47% battery and pumped storage. In 2025, solar made 107% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar15152.7%403,005
Battery and pumped storage13547.3%-25,161

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Chestnut plant?

Chestnut is in Lemoore, Kings County, California, at 36.1602° N, 119.9049° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Chestnut's 151 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Edwards Sanborn E1BKern154371,792
Mount Signal Solar Farm IIImperial154402,547
North Rosamond Solar LLCKern151397,173
ChestnutKings151403,005
CA Flats Solar 150, LLCSan Luis Obispo150305,407
Mustang TwoKings150396,295
Fifth Standard Solar PV, LLC (Hybrid)Fresno150327,093

Source: EIA Forms EIA-860 and EIA-923, 2025.