Solar power plant, California
Chestnut solar power plant, California
Chestnut is a 286 MW power plant, 151 MW of it solar, in Kings County, California, operated by Chestnut Westside LLC, and it generated 377,844 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 93rd percentile of U.S. solar plants. By 2025 generation it ranks 1,663rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Chestnut plant run compared with other solar plants?
The Chestnut plant's solar units had a capacity factor of 31% in 2025 on 151 MW of net summer capacity, the 93rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 111 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Chestnut | 31% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Chestnut plant generating more or less than last year?
Generation at Chestnut rose 3.9% from 2024 to 2025, from 363,836 MWh to 377,844 MWh. Through August 2026 it is running 6.8% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 363,836 |
| 2025 | 377,844 |
| 2026 through August | 271,087 |
| 2025, same months | 290,806 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 42,739 |
| July 2026 | 46,712 |
| June 2026 | 42,662 |
| May 2026 | 36,309 |
| April 2026 | 29,741 |
| March 2026 | 35,531 |
| February 2026 | 22,361 |
| January 2026 | 15,032 |
| December 2025 | 5,738 |
| November 2025 | 12,821 |
| October 2025 | 30,780 |
| September 2025 | 37,699 |
| August 2025 | 44,574 |
| July 2025 | 49,989 |
| June 2025 | 49,596 |
| May 2025 | 45,501 |
| April 2025 | 31,718 |
| March 2025 | 26,205 |
| February 2025 | 20,420 |
| January 2025 | 22,803 |
| December 2024 | 14,217 |
| November 2024 | 19,797 |
| October 2024 | 28,293 |
| September 2024 | 35,057 |
| August 2024 | 43,020 |
| July 2024 | 45,388 |
| June 2024 | 42,425 |
| May 2024 | 37,180 |
| April 2024 | 29,322 |
| March 2024 | 19,154 |
| February 2024 | 33,908 |
| January 2024 | 16,075 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Chestnut plant, and when do they retire?
2 operable generators total 286 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 286 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BESS1 | Operating | Batteries | 135 | 2023 | n/a |
| CHNUT | Operating | Solar Photovoltaic | 151 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Chestnut plant?
EIA lists no joint owners for Chestnut. Chestnut Westside LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Chestnut plant use?
Chestnut has capacity on 2 fuels: 53% solar and 47% battery and pumped storage. In 2025, solar made 107% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 151 | 52.7% | 403,005 |
| Battery and pumped storage | 135 | 47.3% | -25,161 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Chestnut plant?
Chestnut is in Lemoore, Kings County, California, at 36.1602° N, 119.9049° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Chestnut's 151 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Edwards Sanborn E1B | Kern | 154 | 371,792 |
| Mount Signal Solar Farm II | Imperial | 154 | 402,547 |
| North Rosamond Solar LLC | Kern | 151 | 397,173 |
| Chestnut | Kings | 151 | 403,005 |
| CA Flats Solar 150, LLC | San Luis Obispo | 150 | 305,407 |
| Mustang Two | Kings | 150 | 396,295 |
| Fifth Standard Solar PV, LLC (Hybrid) | Fresno | 150 | 327,093 |
Source: EIA Forms EIA-860 and EIA-923, 2025.