Mustang Two solar power plant, California

Mustang Two is a 150 MW solar power plant in Kings County, California, operated by RE Mustang Two LLC, and it generated 396,295 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 92nd percentile of U.S. solar plants. By 2025 generation it ranks 1,602nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

150 MWNameplate capacity
30%Capacity factor, 2025, 92nd percentile, on 150 MW net summer
0.2%Of CA generation, 2025
5 yearsAverage generator age, by MW

How hard does the Mustang Two plant run compared with other solar plants?

The Mustang Two plant had a capacity factor of 30% in 2025 on 150 MW of net summer capacity, the 92nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 110 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Mustang Two30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Mustang Two plant generating more or less than last year?

Generation at Mustang Two rose 3.2% from 2024 to 2025, from 384,133 MWh to 396,295 MWh. Through August 2026 it is running 71.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024384,133
2025396,295
2026 through August87,591
2025, same months309,813
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20260
July 20260
June 20260
May 20260
April 202613,313
March 202636,505
February 202621,478
January 202616,295
December 20257,671
November 202514,807
October 202530,301
September 202533,703
August 202545,911
July 202552,021
June 202549,870
May 202550,842
April 202539,524
March 202527,664
February 202521,435
January 202522,546
December 202414,120
November 202420,469
October 202428,398
September 202437,370
August 202442,359
July 202445,735
June 202447,584
May 202444,666
April 202439,917
March 202432,414
February 202417,662
January 202413,439

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Mustang Two plant?

Mustang Two made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 178th largest of 1,877 plants in California, the 1,967th largest of 14,327 in the U.S. and the 262nd largest of 7,223 solar plants. By 2025 generation it is the 116th largest of 1,608 generating plants in the state.

Mustang Two within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)150107,4330.1%
Generation (MWh)396,295204,542,8980.2%
Solar capacity (MW)15024,6630.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Mustang Two plant, and when do they retire?

2 operable generators total 150 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2150100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
M2BAROperatingSolar Photovoltaic502020n/a
M2WHIOperatingSolar Photovoltaic1002020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Mustang Two plant?

Idemitsu Renewables is the only joint owner reported for Mustang Two, with 100.0%. RE Mustang Two LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Mustang Two plant?

Mustang Two is in Lemoore, Kings County, California, at 36.2168° N, 119.8964° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Mustang Two's 150 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
North Rosamond Solar LLCKern151397,173
ChestnutKings151403,005
CA Flats Solar 150, LLCSan Luis Obispo150305,407
Mustang TwoKings150396,295
Fifth Standard Solar PV, LLC (Hybrid)Fresno150327,093
Baldy Mesa Solar & StorageSan Bernardino150303,251
Northern Orchard Solar PV, LLCKern150210,871

Source: EIA Forms EIA-860 and EIA-923, 2025.