Solar power plant, California
Northern Orchard Solar PV, LLC power plant, California
Northern Orchard Solar PV, LLC is a 242 MW power plant, 150 MW of it solar, in Kern County, California, operated by RWE Clean Energy, and it generated 207,796 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 13th percentile of U.S. solar plants. By 2025 generation it ranks 2,438th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Northern Orchard Solar PV, LLC plant run compared with other solar plants?
The Northern Orchard Solar PV, LLC plant's solar units had a capacity factor of 16% in 2025 on 150 MW of net summer capacity, the 13th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 59 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Northern Orchard Solar PV, LLC | 16% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Northern Orchard Solar PV, LLC plant generating more or less than last year?
Northern Orchard Solar PV, LLC generated 207,796 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 181.8% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 207,796 |
| 2026 through August | 304,606 |
| 2025, same months | 108,096 |
Monthly generation, Jul 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 46,955 |
| July 2026 | 50,148 |
| June 2026 | 49,475 |
| May 2026 | 44,325 |
| April 2026 | 28,363 |
| March 2026 | 40,367 |
| February 2026 | 24,571 |
| January 2026 | 20,402 |
| December 2025 | 8,729 |
| November 2025 | 18,224 |
| October 2025 | 34,419 |
| September 2025 | 38,328 |
| August 2025 | 50,605 |
| July 2025 | 57,491 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Northern Orchard Solar PV, LLC plant, and when do they retire?
2 operable generators total 242 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 242 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| NO1 | Operating | Solar Photovoltaic | 150 | 2025 | n/a |
| NOBAT | Operating | Batteries | 92 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Northern Orchard Solar PV, LLC plant?
EIA lists no joint owners for Northern Orchard Solar PV, LLC. RWE Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Northern Orchard Solar PV, LLC plant use?
Northern Orchard Solar PV, LLC has capacity on 2 fuels: 62% solar and 38% battery and pumped storage. In 2025, solar made 101% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 150 | 62.0% | 210,871 |
| Battery and pumped storage | 92 | 38.0% | -3,075 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Northern Orchard Solar PV, LLC plant?
Northern Orchard Solar PV, LLC is in Taft, Kern County, California, at 35.1202° N, 119.2790° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Northern Orchard Solar PV, LLC's 150 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Mustang Two | Kings | 150 | 396,295 |
| Fifth Standard Solar PV, LLC (Hybrid) | Fresno | 150 | 327,093 |
| Baldy Mesa Solar & Storage | San Bernardino | 150 | 303,251 |
| Northern Orchard Solar PV, LLC | Kern | 150 | 210,871 |
| Edwards Sanborn E1A | Kern | 149 | 347,607 |
| Edwards Sanborn E4 | Kern | 149 | 326,084 |
| Imperial Solar Energy Center West | Imperial | 149 | 356,963 |
Source: EIA Forms EIA-860 and EIA-923, 2025.