Solar power plant, California
Imperial Solar Energy Center West power plant, California
Imperial Solar Energy Center West is a 149 MW solar power plant in Imperial County, California, operated by CSOLAR IV West LLC, and it generated 356,963 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 80th percentile of U.S. solar plants. By 2025 generation it ranks 1,749th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Imperial Solar Energy Center West plant run compared with other solar plants?
The Imperial Solar Energy Center West plant had a capacity factor of 27% in 2025 on 149 MW of net summer capacity, the 80th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 100 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Imperial Solar Energy Center West | 27% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Imperial Solar Energy Center West plant generating more or less than last year?
Generation at Imperial Solar Energy Center West fell 4.5% from 2024 to 2025, from 373,638 MWh to 356,963 MWh.
| Period | MWh |
|---|---|
| 2024 | 373,638 |
| 2025 | 356,963 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 18,096 |
| November 2025 | 19,807 |
| October 2025 | 28,366 |
| September 2025 | 32,062 |
| August 2025 | 37,385 |
| July 2025 | 43,589 |
| June 2025 | 41,133 |
| May 2025 | 36,704 |
| April 2025 | 32,620 |
| March 2025 | 24,405 |
| February 2025 | 21,300 |
| January 2025 | 21,496 |
| December 2024 | 20,092 |
| November 2024 | 22,771 |
| October 2024 | 30,073 |
| September 2024 | 35,337 |
| August 2024 | 38,752 |
| July 2024 | 41,104 |
| June 2024 | 44,948 |
| May 2024 | 39,085 |
| April 2024 | 31,881 |
| March 2024 | 26,714 |
| February 2024 | 22,764 |
| January 2024 | 20,117 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Imperial Solar Energy Center West plant, and when do they retire?
1 operable generator totals 149 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 149 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 56819 | Operating | Solar Photovoltaic | 149 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Imperial Solar Energy Center West plant?
3 owners report shares in Imperial Solar Energy Center West; Tenaska CSOLAR West Holdings, LLC holds the largest named share, 74.0% or about 110 MW. CSOLAR IV West LLC operates the plant.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| Tenaska CSOLAR West Holdings, LLC | 74.0% | 110 | 264,153 |
| CD Global Solar II, CSOLAR, LLC | 25.0% | 37 | 89,241 |
| Tenaska CSOLAR West, LLC | 1.0% | 1 | 3,570 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
Where is the Imperial Solar Energy Center West plant?
Imperial Solar Energy Center West is in Seeley, Imperial County, California, at 32.7722° N, 115.7793° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Imperial Solar Energy Center West's 149 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Northern Orchard Solar PV, LLC | Kern | 150 | 210,871 |
| Edwards Sanborn E1A | Kern | 149 | 347,607 |
| Edwards Sanborn E4 | Kern | 149 | 326,084 |
| Imperial Solar Energy Center West | Imperial | 149 | 356,963 |
| Edwards Sanborn 1C | Kern | 148 | 37,973 |
| Campo Verde Solar | Imperial | 147 | 292,680 |
| Panoche Valley Solar Farm | San Benito | 140 | 271,653 |
Source: EIA Forms EIA-860 and EIA-923, 2025.