Imperial Solar Energy Center West power plant, California

Imperial Solar Energy Center West is a 149 MW solar power plant in Imperial County, California, operated by CSOLAR IV West LLC, and it generated 356,963 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 80th percentile of U.S. solar plants. By 2025 generation it ranks 1,749th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

149 MWNameplate capacity
27%Capacity factor, 2025, 80th percentile, on 149 MW net summer
0.2%Of CA generation, 2025
9 yearsAverage generator age, by MW

How hard does the Imperial Solar Energy Center West plant run compared with other solar plants?

The Imperial Solar Energy Center West plant had a capacity factor of 27% in 2025 on 149 MW of net summer capacity, the 80th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 100 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Imperial Solar Energy Center West27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Imperial Solar Energy Center West plant generating more or less than last year?

Generation at Imperial Solar Energy Center West fell 4.5% from 2024 to 2025, from 373,638 MWh to 356,963 MWh.

Net generation by period
PeriodMWh
2024373,638
2025356,963
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202518,096
November 202519,807
October 202528,366
September 202532,062
August 202537,385
July 202543,589
June 202541,133
May 202536,704
April 202532,620
March 202524,405
February 202521,300
January 202521,496
December 202420,092
November 202422,771
October 202430,073
September 202435,337
August 202438,752
July 202441,104
June 202444,948
May 202439,085
April 202431,881
March 202426,714
February 202422,764
January 202420,117

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Imperial Solar Energy Center West plant?

Imperial Solar Energy Center West made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 191st largest of 1,877 plants in California, the 2,086th largest of 14,327 in the U.S. and the 315th largest of 7,223 solar plants. By 2025 generation it is the 138th largest of 1,608 generating plants in the state.

Imperial Solar Energy Center West within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)149107,4330.1%
Generation (MWh)356,963204,542,8980.2%
Solar capacity (MW)14924,6630.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Imperial Solar Energy Center West plant, and when do they retire?

1 operable generator totals 149 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1149100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
56819OperatingSolar Photovoltaic1492016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Imperial Solar Energy Center West plant?

3 owners report shares in Imperial Solar Energy Center West; Tenaska CSOLAR West Holdings, LLC holds the largest named share, 74.0% or about 110 MW. CSOLAR IV West LLC operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Tenaska CSOLAR West Holdings, LLC74.0%110264,153
CD Global Solar II, CSOLAR, LLC25.0%3789,241
Tenaska CSOLAR West, LLC1.0%13,570

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Imperial Solar Energy Center West plant?

Imperial Solar Energy Center West is in Seeley, Imperial County, California, at 32.7722° N, 115.7793° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Imperial Solar Energy Center West's 149 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Northern Orchard Solar PV, LLCKern150210,871
Edwards Sanborn E1AKern149347,607
Edwards Sanborn E4Kern149326,084
Imperial Solar Energy Center WestImperial149356,963
Edwards Sanborn 1CKern14837,973
Campo Verde SolarImperial147292,680
Panoche Valley Solar FarmSan Benito140271,653

Source: EIA Forms EIA-860 and EIA-923, 2025.