Solar power plant, California
Edwards Sanborn 1C solar power plant, California
Edwards Sanborn 1C is a 148 MW solar power plant in Kern County, California, operated by Terra-Gen Operating Co-Hybrid, and it generated 37,973 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 3rd percentile of U.S. solar plants. By 2025 generation it ranks 4,430th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Edwards Sanborn 1C plant run compared with other solar plants?
The Edwards Sanborn 1C plant had a capacity factor of 3% in 2025 on 148 MW of net summer capacity, the 3rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 11 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Edwards Sanborn 1C | 3% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Edwards Sanborn 1C plant generating more or less than last year?
Edwards Sanborn 1C generated 37,973 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 37,973 |
| 2026 through August | 301,305 |
Monthly generation, Nov 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 43,459 |
| July 2026 | 42,040 |
| June 2026 | 47,852 |
| May 2026 | 47,944 |
| April 2026 | 41,369 |
| March 2026 | 35,280 |
| February 2026 | 23,191 |
| January 2026 | 20,170 |
| December 2025 | 18,574 |
| November 2025 | 19,399 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Edwards Sanborn 1C plant, and when do they retire?
2 operable generators total 148 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 148 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| S5 | Operating | Solar Photovoltaic | 46 | 2025 | n/a |
| S6 | Operating | Solar Photovoltaic | 102 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Edwards Sanborn 1C plant?
EdSan 1C Solar, LLC is the only joint owner reported for Edwards Sanborn 1C, with 100.0%. Terra-Gen Operating Co-Hybrid operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Edwards Sanborn 1C plant?
Edwards Sanborn 1C is in Mojave, Kern County, California, at 35.0262° N, 118.1529° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Edwards Sanborn 1C's 148 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Edwards Sanborn E1A | Kern | 149 | 347,607 |
| Edwards Sanborn E4 | Kern | 149 | 326,084 |
| Imperial Solar Energy Center West | Imperial | 149 | 356,963 |
| Edwards Sanborn 1C | Kern | 148 | 37,973 |
| Campo Verde Solar | Imperial | 147 | 292,680 |
| Panoche Valley Solar Farm | San Benito | 140 | 271,653 |
| Rosamond South 1 | Kern | 140 | 164,725 |
Source: EIA Forms EIA-860 and EIA-923, 2025.