Solar power plant, California
Rosamond South 1 solar power plant, California
Rosamond South 1 is a 257 MW power plant, 140 MW of it solar, in Kern County, California, operated by Golden Fields Solar IV, LLC, and it generated 157,426 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 10th percentile of U.S. solar plants. By 2025 generation it ranks 2,829th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Rosamond South 1 plant run compared with other solar plants?
The Rosamond South 1 plant's solar units had a capacity factor of 13% in 2025 on 140 MW of net summer capacity, the 10th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 49 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Rosamond South 1 | 13% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Rosamond South 1 plant generating more or less than last year?
Rosamond South 1 generated 157,426 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 623.0% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 157,426 |
| 2026 through August | 300,211 |
| 2025, same months | 41,521 |
Monthly generation, Aug 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 42,651 |
| July 2026 | 44,717 |
| June 2026 | 46,304 |
| May 2026 | 42,453 |
| April 2026 | 37,725 |
| March 2026 | 38,144 |
| February 2026 | 24,608 |
| January 2026 | 23,609 |
| December 2025 | 21,806 |
| November 2025 | 21,648 |
| October 2025 | 35,604 |
| September 2025 | 36,847 |
| August 2025 | 41,521 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Rosamond South 1 plant, and when do they retire?
2 operable generators total 257 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 257 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| RBESS | Operating | Batteries | 117 | 2025 | n/a |
| RS1 | Operating | Solar Photovoltaic | 140 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Rosamond South 1 plant?
EIA lists no joint owners for Rosamond South 1. Golden Fields Solar IV, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Rosamond South 1 plant use?
Rosamond South 1 has capacity on 2 fuels: 54% solar and 46% battery and pumped storage. In 2025, solar made 105% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 140 | 54.5% | 164,725 |
| Battery and pumped storage | 117 | 45.5% | -7,299 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Rosamond South 1 plant?
Rosamond South 1 is in Rosamond, Kern County, California, at 34.8425° N, 118.3785° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Rosamond South 1's 140 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Edwards Sanborn 1C | Kern | 148 | 37,973 |
| Campo Verde Solar | Imperial | 147 | 292,680 |
| Panoche Valley Solar Farm | San Benito | 140 | 271,653 |
| Rosamond South 1 | Kern | 140 | 164,725 |
| Edwards Sanborn E2 | Kern | 138 | 314,267 |
| Blythe Solar IV, LLC | Riverside | 137 | 353,598 |
| Blythe Solar III, LLC Hybrid | Riverside | 137 | 369,730 |
Source: EIA Forms EIA-860 and EIA-923, 2025.