Solar power plant, California

Rosamond South 1 solar power plant, California

Rosamond South 1 is a 257 MW power plant, 140 MW of it solar, in Kern County, California, operated by Golden Fields Solar IV, LLC, and it generated 157,426 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 10th percentile of U.S. solar plants. By 2025 generation it ranks 2,829th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

257 MWNameplate capacity
13%Capacity factor, 2025, solar units, 10th percentile, on 140 MW net summer
0.1%Of CA generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Rosamond South 1 plant run compared with other solar plants?

The Rosamond South 1 plant's solar units had a capacity factor of 13% in 2025 on 140 MW of net summer capacity, the 10th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 49 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Rosamond South 113%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Rosamond South 1 plant generating more or less than last year?

Rosamond South 1 generated 157,426 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 623.0% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
2025157,426
2026 through August300,211
2025, same months41,521
Monthly generation, Aug 2025 to Aug 2026
MonthMWh
August 202642,651
July 202644,717
June 202646,304
May 202642,453
April 202637,725
March 202638,144
February 202624,608
January 202623,609
December 202521,806
November 202521,648
October 202535,604
September 202536,847
August 202541,521

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Rosamond South 1 plant?

Rosamond South 1 made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 94th largest of 1,877 plants in California, the 1,212th largest of 14,327 in the U.S. and the 332nd largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 285th largest of 1,608 generating plants in the state.

Rosamond South 1 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)257107,4330.2%
Generation (MWh)157,426204,542,8980.1%
Solar capacity (MW)14024,6630.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Rosamond South 1 plant, and when do they retire?

2 operable generators total 257 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2257100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
RBESSOperatingBatteries1172025n/a
RS1OperatingSolar Photovoltaic1402025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Rosamond South 1 plant?

EIA lists no joint owners for Rosamond South 1. Golden Fields Solar IV, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Rosamond South 1 plant use?

Rosamond South 1 has capacity on 2 fuels: 54% solar and 46% battery and pumped storage. In 2025, solar made 105% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar14054.5%164,725
Battery and pumped storage11745.5%-7,299

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Rosamond South 1 plant?

Rosamond South 1 is in Rosamond, Kern County, California, at 34.8425° N, 118.3785° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Rosamond South 1's 140 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Edwards Sanborn 1CKern14837,973
Campo Verde SolarImperial147292,680
Panoche Valley Solar FarmSan Benito140271,653
Rosamond South 1Kern140164,725
Edwards Sanborn E2Kern138314,267
Blythe Solar IV, LLCRiverside137353,598
Blythe Solar III, LLC HybridRiverside137369,730

Source: EIA Forms EIA-860 and EIA-923, 2025.