Edwards Sanborn E2 is a 258 MW power plant, 138 MW of it solar, in Kern County, California, operated by Terra-Gen Operating Co-Hybrid, and it generated 300,584 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 71st percentile of U.S. solar plants. By 2025 generation it ranks 1,969th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Edwards Sanborn E2 plant run compared with other solar plants?
The Edwards Sanborn E2 plant's solar units had a capacity factor of 26% in 2025 on 138 MW of net summer capacity, the 71st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 95 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Edwards Sanborn E2 | 26% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Edwards Sanborn E2 plant generating more or less than last year?
Generation at Edwards Sanborn E2 rose 1.9% from 2024 to 2025, from 294,882 MWh to 300,584 MWh. Through August 2026 it is running 5.0% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 294,882 |
| 2025 | 300,584 |
| 2026 through August | 212,178 |
| 2025, same months | 223,323 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 33,265 |
| July 2026 | 33,994 |
| June 2026 | 38,249 |
| May 2026 | 33,757 |
| April 2026 | 20,119 |
| March 2026 | 22,604 |
| February 2026 | 15,543 |
| January 2026 | 14,647 |
| December 2025 | 12,909 |
| November 2025 | 13,587 |
| October 2025 | 23,508 |
| September 2025 | 27,257 |
| August 2025 | 33,228 |
| July 2025 | 37,942 |
| June 2025 | 36,464 |
| May 2025 | 33,683 |
| April 2025 | 30,923 |
| March 2025 | 18,392 |
| February 2025 | 16,528 |
| January 2025 | 16,163 |
| December 2024 | 12,228 |
| November 2024 | 14,963 |
| October 2024 | 21,571 |
| September 2024 | 26,467 |
| August 2024 | 32,072 |
| July 2024 | 33,732 |
| June 2024 | 35,047 |
| May 2024 | 36,692 |
| April 2024 | 29,118 |
| March 2024 | 22,388 |
| February 2024 | 16,047 |
| January 2024 | 14,557 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Edwards Sanborn E2 plant, and when do they retire?
2 operable generators total 258 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 258 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PV | Operating | Solar Photovoltaic | 138 | 2021 | n/a |
| BESS | Operating | Batteries | 120 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Edwards Sanborn E2 plant?
EIA lists no joint owners for Edwards Sanborn E2. Terra-Gen Operating Co-Hybrid operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Edwards Sanborn E2 plant use?
Edwards Sanborn E2 has capacity on 2 fuels: 53% solar and 47% battery and pumped storage. In 2025, solar made 105% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 138 | 53.5% | 314,267 |
| Battery and pumped storage | 120 | 46.5% | -13,683 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Edwards Sanborn E2 plant?
Edwards Sanborn E2 is in Mojave, Kern County, California, at 34.9415° N, 118.1290° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Edwards Sanborn E2's 138 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Campo Verde Solar | Imperial | 147 | 292,680 |
| Panoche Valley Solar Farm | San Benito | 140 | 271,653 |
| Rosamond South 1 | Kern | 140 | 164,725 |
| Edwards Sanborn E2 | Kern | 138 | 314,267 |
| Blythe Solar IV, LLC | Riverside | 137 | 353,598 |
| Blythe Solar III, LLC Hybrid | Riverside | 137 | 369,730 |
| Ivanpah 2 | San Bernardino | 133 | 233,497 |