Solar power plant, California

Edwards Sanborn E2 solar power plant, California

Edwards Sanborn E2 is a 258 MW power plant, 138 MW of it solar, in Kern County, California, operated by Terra-Gen Operating Co-Hybrid, and it generated 300,584 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 71st percentile of U.S. solar plants. By 2025 generation it ranks 1,969th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

258 MWNameplate capacity
26%Capacity factor, 2025, solar units, 71st percentile, on 138 MW net summer
0.1%Of CA generation, 2025
4 yearsAverage generator age, by MW

How hard does the Edwards Sanborn E2 plant run compared with other solar plants?

The Edwards Sanborn E2 plant's solar units had a capacity factor of 26% in 2025 on 138 MW of net summer capacity, the 71st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 95 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Edwards Sanborn E226%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Edwards Sanborn E2 plant generating more or less than last year?

Generation at Edwards Sanborn E2 rose 1.9% from 2024 to 2025, from 294,882 MWh to 300,584 MWh. Through August 2026 it is running 5.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024294,882
2025300,584
2026 through August212,178
2025, same months223,323
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202633,265
July 202633,994
June 202638,249
May 202633,757
April 202620,119
March 202622,604
February 202615,543
January 202614,647
December 202512,909
November 202513,587
October 202523,508
September 202527,257
August 202533,228
July 202537,942
June 202536,464
May 202533,683
April 202530,923
March 202518,392
February 202516,528
January 202516,163
December 202412,228
November 202414,963
October 202421,571
September 202426,467
August 202432,072
July 202433,732
June 202435,047
May 202436,692
April 202429,118
March 202422,388
February 202416,047
January 202414,557

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Edwards Sanborn E2 plant?

Edwards Sanborn E2 made 0.1% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 93rd largest of 1,877 plants in California, the 1,210th largest of 14,327 in the U.S. and the 336th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 170th largest of 1,608 generating plants in the state.

Edwards Sanborn E2 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)258107,4330.2%
Generation (MWh)300,584204,542,8980.1%
Solar capacity (MW)13824,6630.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Edwards Sanborn E2 plant, and when do they retire?

2 operable generators total 258 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2258100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PVOperatingSolar Photovoltaic1382021n/a
BESSOperatingBatteries1202022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Edwards Sanborn E2 plant?

EIA lists no joint owners for Edwards Sanborn E2. Terra-Gen Operating Co-Hybrid operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Edwards Sanborn E2 plant use?

Edwards Sanborn E2 has capacity on 2 fuels: 53% solar and 47% battery and pumped storage. In 2025, solar made 105% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar13853.5%314,267
Battery and pumped storage12046.5%-13,683

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Edwards Sanborn E2 plant?

Edwards Sanborn E2 is in Mojave, Kern County, California, at 34.9415° N, 118.1290° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Edwards Sanborn E2's 138 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Campo Verde SolarImperial147292,680
Panoche Valley Solar FarmSan Benito140271,653
Rosamond South 1Kern140164,725
Edwards Sanborn E2Kern138314,267
Blythe Solar IV, LLCRiverside137353,598
Blythe Solar III, LLC HybridRiverside137369,730
Ivanpah 2San Bernardino133233,497

Source: EIA Forms EIA-860 and EIA-923, 2025.