Blythe Solar III, LLC Hybrid power plant, California

Blythe Solar III, LLC Hybrid is a 252 MW power plant, 137 MW of it solar, in Riverside County, California, operated by Blythe Solar III, LLC, and it generated 354,627 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 94th percentile of U.S. solar plants. By 2025 generation it ranks 1,757th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

252 MWNameplate capacity
31%Capacity factor, 2025, solar units, 94th percentile, on 137 MW net summer
0.2%Of CA generation, 2025
5 yearsAverage generator age, by MW

How hard does the Blythe Solar III, LLC Hybrid plant run compared with other solar plants?

The Blythe Solar III, LLC Hybrid plant's solar units had a capacity factor of 31% in 2025 on 137 MW of net summer capacity, the 94th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 113 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Blythe Solar III, LLC Hybrid31%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Blythe Solar III, LLC Hybrid plant generating more or less than last year?

Generation at Blythe Solar III, LLC Hybrid rose 1.5% from 2024 to 2025, from 349,412 MWh to 354,627 MWh. Through August 2026 it is running 4.9% behind the same months of 2025.

Net generation by period
PeriodMWh
2024349,412
2025354,627
2026 through August246,016
2025, same months258,629
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202633,614
July 202635,878
June 202639,136
May 202637,166
April 202626,676
March 202632,107
February 202622,052
January 202619,387
December 202518,077
November 202519,526
October 202529,156
September 202529,239
August 202534,265
July 202539,553
June 202540,288
May 202537,921
April 202535,473
March 202532,817
February 202518,094
January 202520,218
December 202418,089
November 202421,293
October 202426,481
September 202433,196
August 202435,602
July 202436,867
June 202436,759
May 202439,609
April 202434,097
March 202428,739
February 202421,806
January 202416,874

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Blythe Solar III, LLC Hybrid plant?

Blythe Solar III, LLC Hybrid made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 99th largest of 1,877 plants in California, the 1,232nd largest of 14,327 in the U.S. and the 338th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 141st largest of 1,608 generating plants in the state.

Blythe Solar III, LLC Hybrid within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)252107,4330.2%
Generation (MWh)354,627204,542,8980.2%
Solar capacity (MW)13724,6630.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Blythe Solar III, LLC Hybrid plant, and when do they retire?

2 operable generators total 252 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2252100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BLSL3OperatingSolar Photovoltaic1372020n/a
BLST3OperatingBatteries1152021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Blythe Solar III, LLC Hybrid plant?

EIA lists no joint owners for Blythe Solar III, LLC Hybrid. Blythe Solar III, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Blythe Solar III, LLC Hybrid plant use?

Blythe Solar III, LLC Hybrid has capacity on 2 fuels: 54% solar and 46% battery and pumped storage. In 2025, solar made 104% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar13754.3%369,730
Battery and pumped storage11545.7%-15,103

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Blythe Solar III, LLC Hybrid plant?

Blythe Solar III, LLC Hybrid is in Blythe, Riverside County, California, at 33.6560° N, 114.7420° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Blythe Solar III, LLC Hybrid's 137 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Rosamond South 1Kern140164,725
Edwards Sanborn E2Kern138314,267
Blythe Solar IV, LLCRiverside137353,598
Blythe Solar III, LLC HybridRiverside137369,730
Ivanpah 2San Bernardino133233,497
Ivanpah 3San Bernardino133228,864
Maverick Solar 7, LLCRiverside132352,097

Source: EIA Forms EIA-860 and EIA-923, 2025.