Solar power plant, California

Maverick Solar 7, LLC power plant, California

Maverick Solar 7, LLC is a 132 MW solar power plant in Riverside County, California, operated by Maverick Solar 7, LLC, and it generated 352,097 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 93rd percentile of U.S. solar plants. By 2025 generation it ranks 1,766th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

132 MWNameplate capacity
30%Capacity factor, 2025, 93rd percentile, on 132 MW net summer
0.2%Of CA generation, 2025
4 yearsAverage generator age, by MW

How hard does the Maverick Solar 7, LLC plant run compared with other solar plants?

The Maverick Solar 7, LLC plant had a capacity factor of 30% in 2025 on 132 MW of net summer capacity, the 93rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 111 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Maverick Solar 7, LLC30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Maverick Solar 7, LLC plant generating more or less than last year?

Generation at Maverick Solar 7, LLC rose 17.0% from 2024 to 2025, from 300,995 MWh to 352,097 MWh. Through August 2026 it is running 18.0% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024300,995
2025352,097
2026 through August292,033
2025, same months247,470
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202639,635
July 202641,837
June 202645,313
May 202644,843
April 202637,788
March 202635,489
February 202624,919
January 202622,209
December 202519,862
November 202521,394
October 202531,959
September 202531,412
August 202540,269
July 202545,233
June 202542,861
May 202542,986
April 202532,882
March 202513,062
February 202512,494
January 202517,683
December 202417,635
November 202418,506
October 202421,804
September 202430,895
August 202436,072
July 202439,649
June 202440,588
May 202432,323
April 202421,670
March 202410,963
February 202415,506
January 202415,384

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Maverick Solar 7, LLC plant?

Maverick Solar 7, LLC made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.1% of the state's 107,433 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 211th largest of 1,877 plants in California, the 2,191st largest of 14,327 in the U.S. and the 347th largest of 7,223 solar plants. By 2025 generation it is the 142nd largest of 1,608 generating plants in the state.

Maverick Solar 7, LLC within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)132107,4330.1%
Generation (MWh)352,097204,542,8980.2%
Solar capacity (MW)13224,6630.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Maverick Solar 7, LLC plant, and when do they retire?

1 operable generator totals 132 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1132100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MAV05OperatingSolar Photovoltaic1322021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Maverick Solar 7, LLC plant?

EIA lists no joint owners for Maverick Solar 7, LLC. Maverick Solar 7, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Maverick Solar 7, LLC plant?

Maverick Solar 7, LLC is in Desert Center, Riverside County, California, at 33.7000° N, 115.3800° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Maverick Solar 7, LLC's 132 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Blythe Solar III, LLC HybridRiverside137369,730
Ivanpah 2San Bernardino133233,497
Ivanpah 3San Bernardino133228,864
Maverick Solar 7, LLCRiverside132352,097
Blythe Solar II, LLCRiverside131351,256
Arlington Energy Center IIIRiverside131340,489
CA Flats Solar 130, LLCSan Luis Obispo130261,824

Source: EIA Forms EIA-860 and EIA-923, 2025.