Skip to main content
RateWatt

Solar power plant, California

Arlington Energy Center III solar power plant, California

Arlington Energy Center III is a 241 MW power plant, 131 MW of it solar, in Riverside County, California, operated by Arlington Energy Center III, and it generated 320,920 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 89th percentile of U.S. solar plants. By 2025 generation it ranks 1,880th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

241 MWNameplate capacity
30%Capacity factor, 2025, solar units, 89th percentile, on 131 MW net summer
0.2%Of CA generation, 2025
3 yearsAverage generator age, by MW

How hard does the Arlington Energy Center III plant run compared with other solar plants?

The Arlington Energy Center III plant's solar units had a capacity factor of 30% in 2025 on 131 MW of net summer capacity, the 89th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 108 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Arlington Energy Center III30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Arlington Energy Center III plant generating more or less than last year?

Generation at Arlington Energy Center III rose 17.2% from 2024 to 2025, from 273,897 MWh to 320,920 MWh. Through August 2026 it is running 3.6% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024273,897
2025320,920
2026 through August238,421
2025, same months230,177
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202633,595
July 202635,622
June 202639,100
May 202636,256
April 202628,132
March 202626,534
February 202619,965
January 202619,217
December 202517,640
November 202518,492
October 202527,198
September 202527,413
August 202534,298
July 202539,665
June 202539,309
May 202533,789
April 202528,286
March 202518,636
February 202517,391
January 202518,803
December 202418,134
November 202419,842
October 202425,387
September 202430,819
August 202433,163
July 202435,936
June 202432,224
May 202424,734
April 202418,124
March 20249,274
February 202413,208
January 202413,052

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Arlington Energy Center III plant?

Arlington Energy Center III made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 111th largest of 1,877 plants in California, the 1,314th largest of 14,327 in the U.S. and the 350th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 157th largest of 1,608 generating plants in the state.

Arlington Energy Center III within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)241107,4330.2%
Generation (MWh)320,920204,542,8980.2%
Solar capacity (MW)13124,6630.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Arlington Energy Center III plant, and when do they retire?

2 operable generators total 241 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2241100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
AEC3OperatingSolar Photovoltaic1312022n/a
AEC3BOperatingBatteries1102022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Arlington Energy Center III plant?

EIA lists no joint owners for Arlington Energy Center III. Arlington Energy Center III operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Arlington Energy Center III plant use?

Arlington Energy Center III has capacity on 2 fuels: 54% solar and 46% battery and pumped storage. In 2025, solar made 106% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar13154.4%340,489
Battery and pumped storage11045.6%-19,569

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Arlington Energy Center III plant?

Arlington Energy Center III is in Blythe, Riverside County, California, at 33.6909° N, 114.7749° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Arlington Energy Center III's 131 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Ivanpah 3San Bernardino133228,864
Maverick Solar 7, LLCRiverside132352,097
Blythe Solar II, LLCRiverside131351,256
Arlington Energy Center IIIRiverside131340,489
CA Flats Solar 130, LLCSan Luis Obispo130261,824
Imperial Solar Energy Center SouthImperial129251,092
American Kings Solar, LLCKings128324,421

Source: EIA Forms EIA-860 and EIA-923, 2025.