Solar power plant, California
Arlington Energy Center III solar power plant, California
Arlington Energy Center III is a 241 MW power plant, 131 MW of it solar, in Riverside County, California, operated by Arlington Energy Center III, and it generated 320,920 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 89th percentile of U.S. solar plants. By 2025 generation it ranks 1,880th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Arlington Energy Center III plant run compared with other solar plants?
The Arlington Energy Center III plant's solar units had a capacity factor of 30% in 2025 on 131 MW of net summer capacity, the 89th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 108 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Arlington Energy Center III | 30% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Arlington Energy Center III plant generating more or less than last year?
Generation at Arlington Energy Center III rose 17.2% from 2024 to 2025, from 273,897 MWh to 320,920 MWh. Through August 2026 it is running 3.6% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 273,897 |
| 2025 | 320,920 |
| 2026 through August | 238,421 |
| 2025, same months | 230,177 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 33,595 |
| July 2026 | 35,622 |
| June 2026 | 39,100 |
| May 2026 | 36,256 |
| April 2026 | 28,132 |
| March 2026 | 26,534 |
| February 2026 | 19,965 |
| January 2026 | 19,217 |
| December 2025 | 17,640 |
| November 2025 | 18,492 |
| October 2025 | 27,198 |
| September 2025 | 27,413 |
| August 2025 | 34,298 |
| July 2025 | 39,665 |
| June 2025 | 39,309 |
| May 2025 | 33,789 |
| April 2025 | 28,286 |
| March 2025 | 18,636 |
| February 2025 | 17,391 |
| January 2025 | 18,803 |
| December 2024 | 18,134 |
| November 2024 | 19,842 |
| October 2024 | 25,387 |
| September 2024 | 30,819 |
| August 2024 | 33,163 |
| July 2024 | 35,936 |
| June 2024 | 32,224 |
| May 2024 | 24,734 |
| April 2024 | 18,124 |
| March 2024 | 9,274 |
| February 2024 | 13,208 |
| January 2024 | 13,052 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Arlington Energy Center III plant, and when do they retire?
2 operable generators total 241 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 241 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| AEC3 | Operating | Solar Photovoltaic | 131 | 2022 | n/a |
| AEC3B | Operating | Batteries | 110 | 2022 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Arlington Energy Center III plant?
EIA lists no joint owners for Arlington Energy Center III. Arlington Energy Center III operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Arlington Energy Center III plant use?
Arlington Energy Center III has capacity on 2 fuels: 54% solar and 46% battery and pumped storage. In 2025, solar made 106% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 131 | 54.4% | 340,489 |
| Battery and pumped storage | 110 | 45.6% | -19,569 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Arlington Energy Center III plant?
Arlington Energy Center III is in Blythe, Riverside County, California, at 33.6909° N, 114.7749° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Arlington Energy Center III's 131 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Ivanpah 3 | San Bernardino | 133 | 228,864 |
| Maverick Solar 7, LLC | Riverside | 132 | 352,097 |
| Blythe Solar II, LLC | Riverside | 131 | 351,256 |
| Arlington Energy Center III | Riverside | 131 | 340,489 |
| CA Flats Solar 130, LLC | San Luis Obispo | 130 | 261,824 |
| Imperial Solar Energy Center South | Imperial | 129 | 251,092 |
| American Kings Solar, LLC | Kings | 128 | 324,421 |
Source: EIA Forms EIA-860 and EIA-923, 2025.