Solar power plant, California
Blythe Solar II, LLC power plant, California
Blythe Solar II, LLC is a 246 MW power plant, 131 MW of it solar, in Riverside County, California, operated by Blythe Solar II, LLC, and it generated 336,977 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 93rd percentile of U.S. solar plants. By 2025 generation it ranks 1,823rd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Blythe Solar II, LLC plant run compared with other solar plants?
The Blythe Solar II, LLC plant's solar units had a capacity factor of 31% in 2025 on 131 MW of net summer capacity, the 93rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 112 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Blythe Solar II, LLC | 31% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Blythe Solar II, LLC plant generating more or less than last year?
Generation at Blythe Solar II, LLC rose 0.9% from 2024 to 2025, from 334,055 MWh to 336,977 MWh. Through August 2026 it is running 4.4% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 334,055 |
| 2025 | 336,977 |
| 2026 through August | 236,151 |
| 2025, same months | 247,120 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 31,798 |
| July 2026 | 33,766 |
| June 2026 | 37,135 |
| May 2026 | 36,889 |
| April 2026 | 26,805 |
| March 2026 | 29,869 |
| February 2026 | 20,751 |
| January 2026 | 19,138 |
| December 2025 | 17,168 |
| November 2025 | 18,405 |
| October 2025 | 27,482 |
| September 2025 | 26,802 |
| August 2025 | 31,033 |
| July 2025 | 37,238 |
| June 2025 | 37,548 |
| May 2025 | 37,135 |
| April 2025 | 34,200 |
| March 2025 | 29,939 |
| February 2025 | 19,496 |
| January 2025 | 20,531 |
| December 2024 | 17,416 |
| November 2024 | 21,289 |
| October 2024 | 24,621 |
| September 2024 | 29,191 |
| August 2024 | 31,423 |
| July 2024 | 34,351 |
| June 2024 | 36,643 |
| May 2024 | 38,407 |
| April 2024 | 34,307 |
| March 2024 | 29,044 |
| February 2024 | 20,227 |
| January 2024 | 17,136 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Blythe Solar II, LLC plant, and when do they retire?
5 operable generators total 246 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 4 | 131 | 53% | none reported |
| 2020s | 1 | 115 | 47% | none reported |
Every generator, 5 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| BLCK4 | Operating | Solar Photovoltaic | 33 | 2016 | n/a |
| BLCK5 | Operating | Solar Photovoltaic | 34 | 2016 | n/a |
| BLCK6 | Operating | Solar Photovoltaic | 32 | 2016 | n/a |
| BLCK7 | Operating | Solar Photovoltaic | 32 | 2016 | n/a |
| BLST2 | Operating | Batteries | 115 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Blythe Solar II, LLC plant?
EIA lists no joint owners for Blythe Solar II, LLC. Blythe Solar II, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Blythe Solar II, LLC plant use?
Blythe Solar II, LLC has capacity on 2 fuels: 53% solar and 47% battery and pumped storage. In 2025, solar made 104% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 131 | 53.3% | 351,256 |
| Battery and pumped storage | 115 | 46.7% | -14,279 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Blythe Solar II, LLC plant?
Blythe Solar II, LLC is in Blythe, Riverside County, California, at 33.6800° N, 114.7300° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Blythe Solar II, LLC's 131 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Ivanpah 2 | San Bernardino | 133 | 233,497 |
| Ivanpah 3 | San Bernardino | 133 | 228,864 |
| Maverick Solar 7, LLC | Riverside | 132 | 352,097 |
| Blythe Solar II, LLC | Riverside | 131 | 351,256 |
| Arlington Energy Center III | Riverside | 131 | 340,489 |
| CA Flats Solar 130, LLC | San Luis Obispo | 130 | 261,824 |
| Imperial Solar Energy Center South | Imperial | 129 | 251,092 |
Source: EIA Forms EIA-860 and EIA-923, 2025.