Solar power plant, California
Edwards Sanborn E4 solar power plant, California
Edwards Sanborn E4 is a 249 MW power plant, 149 MW of it solar, in Kern County, California, operated by Terra-Gen Operating Co-Hybrid, and it generated 321,301 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 64th percentile of U.S. solar plants. By 2025 generation it ranks 1,875th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Edwards Sanborn E4 plant run compared with other solar plants?
The Edwards Sanborn E4 plant's solar units had a capacity factor of 25% in 2025 on 149 MW of net summer capacity, the 64th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 91 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Edwards Sanborn E4 | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Edwards Sanborn E4 plant generating more or less than last year?
Generation at Edwards Sanborn E4 rose 10.1% from 2024 to 2025, from 291,748 MWh to 321,301 MWh. Through August 2026 it is running 3.4% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 291,748 |
| 2025 | 321,301 |
| 2026 through August | 243,938 |
| 2025, same months | 235,857 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 34,234 |
| July 2026 | 32,922 |
| June 2026 | 39,879 |
| May 2026 | 39,099 |
| April 2026 | 34,015 |
| March 2026 | 29,010 |
| February 2026 | 18,673 |
| January 2026 | 16,106 |
| December 2025 | 14,524 |
| November 2025 | 14,631 |
| October 2025 | 26,601 |
| September 2025 | 29,688 |
| August 2025 | 35,637 |
| July 2025 | 36,698 |
| June 2025 | 35,096 |
| May 2025 | 35,990 |
| April 2025 | 34,416 |
| March 2025 | 23,318 |
| February 2025 | 18,249 |
| January 2025 | 16,453 |
| December 2024 | 12,475 |
| November 2024 | 14,453 |
| October 2024 | 23,850 |
| September 2024 | 28,703 |
| August 2024 | 33,411 |
| July 2024 | 34,552 |
| June 2024 | 34,619 |
| May 2024 | 38,034 |
| April 2024 | 27,066 |
| March 2024 | 18,499 |
| February 2024 | 13,646 |
| January 2024 | 12,440 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Edwards Sanborn E4 plant, and when do they retire?
2 operable generators total 249 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 249 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| PV | Operating | Solar Photovoltaic | 149 | 2022 | n/a |
| BESS | Operating | Batteries | 100 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Edwards Sanborn E4 plant?
EdSan 1B Group 1 Sanborn, LLC is the only joint owner reported for Edwards Sanborn E4, with 100.0%. Terra-Gen Operating Co-Hybrid operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Edwards Sanborn E4 plant use?
Edwards Sanborn E4 has capacity on 2 fuels: 60% solar and 40% battery and pumped storage. In 2025, solar made 101% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 149 | 59.8% | 326,084 |
| Battery and pumped storage | 100 | 40.2% | -4,783 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Edwards Sanborn E4 plant?
Edwards Sanborn E4 is in Mojave, Kern County, California, at 34.9436° N, 118.0880° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Edwards Sanborn E4's 149 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Baldy Mesa Solar & Storage | San Bernardino | 150 | 303,251 |
| Northern Orchard Solar PV, LLC | Kern | 150 | 210,871 |
| Edwards Sanborn E1A | Kern | 149 | 347,607 |
| Edwards Sanborn E4 | Kern | 149 | 326,084 |
| Imperial Solar Energy Center West | Imperial | 149 | 356,963 |
| Edwards Sanborn 1C | Kern | 148 | 37,973 |
| Campo Verde Solar | Imperial | 147 | 292,680 |
Source: EIA Forms EIA-860 and EIA-923, 2025.