Solar power plant, California

Edwards Sanborn E4 solar power plant, California

Edwards Sanborn E4 is a 249 MW power plant, 149 MW of it solar, in Kern County, California, operated by Terra-Gen Operating Co-Hybrid, and it generated 321,301 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in California, and its capacity factor sits at the 64th percentile of U.S. solar plants. By 2025 generation it ranks 1,875th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

249 MWNameplate capacity
25%Capacity factor, 2025, solar units, 64th percentile, on 149 MW net summer
0.2%Of CA generation, 2025
3 yearsAverage generator age, by MW

How hard does the Edwards Sanborn E4 plant run compared with other solar plants?

The Edwards Sanborn E4 plant's solar units had a capacity factor of 25% in 2025 on 149 MW of net summer capacity, the 64th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 91 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Edwards Sanborn E425%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Edwards Sanborn E4 plant generating more or less than last year?

Generation at Edwards Sanborn E4 rose 10.1% from 2024 to 2025, from 291,748 MWh to 321,301 MWh. Through August 2026 it is running 3.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024291,748
2025321,301
2026 through August243,938
2025, same months235,857
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202634,234
July 202632,922
June 202639,879
May 202639,099
April 202634,015
March 202629,010
February 202618,673
January 202616,106
December 202514,524
November 202514,631
October 202526,601
September 202529,688
August 202535,637
July 202536,698
June 202535,096
May 202535,990
April 202534,416
March 202523,318
February 202518,249
January 202516,453
December 202412,475
November 202414,453
October 202423,850
September 202428,703
August 202433,411
July 202434,552
June 202434,619
May 202438,034
April 202427,066
March 202418,499
February 202413,646
January 202412,440

Source: EIA Form EIA-923, through August 2026.

How much of California's electricity comes from the Edwards Sanborn E4 plant?

Edwards Sanborn E4 made 0.2% of the 204,542,898 MWh reported by California plants in 2025, from 0.2% of the state's 107,433 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 107th largest of 1,877 plants in California, the 1,287th largest of 14,327 in the U.S. and the 314th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 155th largest of 1,608 generating plants in the state.

Edwards Sanborn E4 within California, 2025
MeasureThis plantCaliforniaShare
Capacity (MW)249107,4330.2%
Generation (MWh)321,301204,542,8980.2%
Solar capacity (MW)14924,6630.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Edwards Sanborn E4 plant, and when do they retire?

2 operable generators total 249 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2249100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PVOperatingSolar Photovoltaic1492022n/a
BESSOperatingBatteries1002023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Edwards Sanborn E4 plant?

EdSan 1B Group 1 Sanborn, LLC is the only joint owner reported for Edwards Sanborn E4, with 100.0%. Terra-Gen Operating Co-Hybrid operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Edwards Sanborn E4 plant use?

Edwards Sanborn E4 has capacity on 2 fuels: 60% solar and 40% battery and pumped storage. In 2025, solar made 101% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar14959.8%326,084
Battery and pumped storage10040.2%-4,783

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Edwards Sanborn E4 plant?

Edwards Sanborn E4 is in Mojave, Kern County, California, at 34.9436° N, 118.0880° W. It sits in the California Independent System Operator balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in California are similar in size?

California has 934 operable solar plants with 24,663 MW of capacity, and Edwards Sanborn E4's 149 MW is 1% of that.

Solar plants in California around this size
PlantCountyMW2025 MWh
Baldy Mesa Solar & StorageSan Bernardino150303,251
Northern Orchard Solar PV, LLCKern150210,871
Edwards Sanborn E1AKern149347,607
Edwards Sanborn E4Kern149326,084
Imperial Solar Energy Center WestImperial149356,963
Edwards Sanborn 1CKern14837,973
Campo Verde SolarImperial147292,680

Source: EIA Forms EIA-860 and EIA-923, 2025.