Solar power plant, California
Fifth Standard Solar PV, LLC (Hybrid) power plant, California
Fifth Standard Solar PV, LLC (Hybrid) is a 287 MW power plant, 150 MW of it solar, in Fresno County, California, operated by RWE Clean Energy, and it generated 301,107 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 63rd percentile of U.S. solar plants. By 2025 generation it ranks 1,967th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Fifth Standard Solar PV, LLC (Hybrid) plant run compared with other solar plants?
The Fifth Standard Solar PV, LLC (Hybrid) plant's solar units had a capacity factor of 25% in 2025 on 150 MW of net summer capacity, the 63rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 91 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Fifth Standard Solar PV, LLC (Hybrid) | 25% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.
Is the Fifth Standard Solar PV, LLC (Hybrid) plant generating more or less than last year?
Generation at Fifth Standard Solar PV, LLC (Hybrid) fell 6.3% from 2024 to 2025, from 321,267 MWh to 301,107 MWh. Through August 2026 it is running 14.5% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 321,267 |
| 2025 | 301,107 |
| 2026 through August | 268,455 |
| 2025, same months | 234,514 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 35,096 |
| July 2026 | 41,885 |
| June 2026 | 46,844 |
| May 2026 | 41,273 |
| April 2026 | 34,650 |
| March 2026 | 35,848 |
| February 2026 | 16,506 |
| January 2026 | 16,353 |
| December 2025 | 6,523 |
| November 2025 | 9,949 |
| October 2025 | 24,282 |
| September 2025 | 25,839 |
| August 2025 | 38,342 |
| July 2025 | 45,129 |
| June 2025 | 43,757 |
| May 2025 | 42,524 |
| April 2025 | 16,400 |
| March 2025 | 12,184 |
| February 2025 | 15,079 |
| January 2025 | 21,099 |
| December 2024 | 13,650 |
| November 2024 | 14,779 |
| October 2024 | 18,535 |
| September 2024 | 17,301 |
| August 2024 | 35,249 |
| July 2024 | 41,301 |
| June 2024 | 45,309 |
| May 2024 | 47,043 |
| April 2024 | 37,244 |
| March 2024 | 22,119 |
| February 2024 | 14,417 |
| January 2024 | 14,320 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Fifth Standard Solar PV, LLC (Hybrid) plant, and when do they retire?
2 operable generators total 287 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 287 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| FTHSB | Operating | Batteries | 137 | 2023 | n/a |
| FTHSS | Operating | Solar Photovoltaic | 150 | 2023 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Fifth Standard Solar PV, LLC (Hybrid) plant?
EIA lists no joint owners for Fifth Standard Solar PV, LLC (Hybrid). RWE Clean Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What fuels does the Fifth Standard Solar PV, LLC (Hybrid) plant use?
Fifth Standard Solar PV, LLC (Hybrid) has capacity on 2 fuels: 52% solar and 48% battery and pumped storage. In 2025, solar made 109% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Solar | 150 | 52.3% | 327,093 |
| Battery and pumped storage | 137 | 47.7% | -25,986 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Fifth Standard Solar PV, LLC (Hybrid) plant?
Fifth Standard Solar PV, LLC (Hybrid) is in Huron, Fresno County, California, at 36.1532° N, 120.1045° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in California are similar in size?
California has 934 operable solar plants with 24,663 MW of capacity, and Fifth Standard Solar PV, LLC (Hybrid)'s 150 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Chestnut | Kings | 151 | 403,005 |
| CA Flats Solar 150, LLC | San Luis Obispo | 150 | 305,407 |
| Mustang Two | Kings | 150 | 396,295 |
| Fifth Standard Solar PV, LLC (Hybrid) | Fresno | 150 | 327,093 |
| Baldy Mesa Solar & Storage | San Bernardino | 150 | 303,251 |
| Northern Orchard Solar PV, LLC | Kern | 150 | 210,871 |
| Edwards Sanborn E1A | Kern | 149 | 347,607 |