Wind power plant, Texas
Gopher Creek Wind Farm, Texas
Gopher Creek Wind Farm is a 158 MW wind power plant in Borden County, Texas, operated by Fluvanna Wind Energy LLC, and it generated 591,691 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 84th percentile of U.S. wind plants. By 2025 generation it ranks 1,141st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Gopher Creek Wind Farm plant run compared with other wind plants?
The Gopher Creek Wind Farm plant had a capacity factor of 43% in 2025 on 158 MW of net summer capacity, the 84th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 156 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Gopher Creek Wind Farm | 43% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Gopher Creek Wind Farm plant generating more or less than last year?
Generation at Gopher Creek Wind Farm rose 2.2% from 2024 to 2025, from 578,682 MWh to 591,691 MWh. Through August 2026 it is running 9.0% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 578,682 |
| 2025 | 591,691 |
| 2026 through August | 434,839 |
| 2025, same months | 398,933 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 43,355 |
| July 2026 | 45,355 |
| June 2026 | 63,082 |
| May 2026 | 50,797 |
| April 2026 | 59,031 |
| March 2026 | 68,013 |
| February 2026 | 50,230 |
| January 2026 | 54,976 |
| December 2025 | 60,197 |
| November 2025 | 50,687 |
| October 2025 | 44,395 |
| September 2025 | 37,479 |
| August 2025 | 40,817 |
| July 2025 | 42,857 |
| June 2025 | 46,850 |
| May 2025 | 46,691 |
| April 2025 | 66,486 |
| March 2025 | 59,287 |
| February 2025 | 45,589 |
| January 2025 | 50,356 |
| December 2024 | 48,379 |
| November 2024 | 50,534 |
| October 2024 | 10,702 |
| September 2024 | 34,226 |
| August 2024 | 51,525 |
| July 2024 | 44,801 |
| June 2024 | 57,109 |
| May 2024 | 58,735 |
| April 2024 | 63,730 |
| March 2024 | 55,282 |
| February 2024 | 59,387 |
| January 2024 | 44,272 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Gopher Creek Wind Farm plant, and when do they retire?
1 operable generator totals 158 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 158 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GCWF | Operating | Onshore Wind Turbine | 158 | 2019 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Gopher Creek Wind Farm plant?
EIA lists no joint owners for Gopher Creek Wind Farm. Fluvanna Wind Energy LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Gopher Creek Wind Farm plant?
Gopher Creek Wind Farm is in Fluvanna, Borden County, Texas, at 32.8751° N, 101.2090° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Gopher Creek Wind Farm's 158 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Spinning Spur Wind II | Oldham | 161 | 381,191 |
| Jumbo Hill Wind Project | Andrews | 161 | 598,850 |
| Rattlesnake Power, LLC | McCulloch | 160 | 580,986 |
| Gopher Creek Wind Farm | Borden | 158 | 591,691 |
| Fluvanna | Scurry | 155 | 528,946 |
| Notrees Windpower Hybrid | Ector | 153 | 241,774 |
| Trent Wind Farm | Nolan | 152 | 525,650 |
Source: EIA Forms EIA-860 and EIA-923, 2025.