Wind power plant, Texas
Rattlesnake Power, LLC wind power plant, Texas
Rattlesnake Power, LLC is a 160 MW wind power plant in McCulloch County, Texas, operated by Rattlesnake Power, LLC, and it generated 580,986 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 79th percentile of U.S. wind plants. By 2025 generation it ranks 1,164th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Rattlesnake Power, LLC plant run compared with other wind plants?
The Rattlesnake Power, LLC plant had a capacity factor of 41% in 2025 on 160 MW of net summer capacity, the 79th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 151 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Rattlesnake Power, LLC | 41% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Rattlesnake Power, LLC plant generating more or less than last year?
Generation at Rattlesnake Power, LLC rose 6.1% from 2024 to 2025, from 547,697 MWh to 580,986 MWh. Through August 2026 it is running 3.3% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 547,697 |
| 2025 | 580,986 |
| 2026 through August | 409,417 |
| 2025, same months | 396,410 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 41,694 |
| July 2026 | 46,474 |
| June 2026 | 61,354 |
| May 2026 | 45,609 |
| April 2026 | 53,214 |
| March 2026 | 69,019 |
| February 2026 | 47,522 |
| January 2026 | 44,531 |
| December 2025 | 55,445 |
| November 2025 | 48,112 |
| October 2025 | 50,738 |
| September 2025 | 30,281 |
| August 2025 | 32,516 |
| July 2025 | 43,192 |
| June 2025 | 58,671 |
| May 2025 | 43,704 |
| April 2025 | 62,818 |
| March 2025 | 63,957 |
| February 2025 | 44,953 |
| January 2025 | 46,599 |
| December 2024 | 45,797 |
| November 2024 | 51,855 |
| October 2024 | 47,888 |
| September 2024 | 22,627 |
| August 2024 | 35,086 |
| July 2024 | 36,859 |
| June 2024 | 46,020 |
| May 2024 | 48,875 |
| April 2024 | 62,011 |
| March 2024 | 48,873 |
| February 2024 | 54,730 |
| January 2024 | 47,076 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Rattlesnake Power, LLC plant, and when do they retire?
1 operable generator totals 160 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 160 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| WT1 | Operating | Onshore Wind Turbine | 160 | 2018 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Rattlesnake Power, LLC plant?
Oppidum Green Energy USA, LLC is the only joint owner reported for Rattlesnake Power, LLC, with 100.0%. Rattlesnake Power, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Rattlesnake Power, LLC plant?
Rattlesnake Power, LLC is in Brady, McCulloch County, Texas, at 31.3603° N, 99.5514° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Rattlesnake Power, LLC's 160 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Bobcat Bluff Wind Project LLC | Archer | 161 | 484,791 |
| Spinning Spur Wind II | Oldham | 161 | 381,191 |
| Jumbo Hill Wind Project | Andrews | 161 | 598,850 |
| Rattlesnake Power, LLC | McCulloch | 160 | 580,986 |
| Gopher Creek Wind Farm | Borden | 158 | 591,691 |
| Fluvanna | Scurry | 155 | 528,946 |
| Notrees Windpower Hybrid | Ector | 153 | 241,774 |
Source: EIA Forms EIA-860 and EIA-923, 2025.