Wind power plant, Texas
Notrees Windpower Hybrid wind power plant, Texas
Notrees Windpower Hybrid is a 189 MW power plant, 153 MW of it wind, in Ector County, Texas, operated by Deriva Energy, and it generated 237,051 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 8th percentile of U.S. wind plants. By 2025 generation it ranks 2,289th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Notrees Windpower Hybrid plant run compared with other wind plants?
The Notrees Windpower Hybrid plant's wind units had a capacity factor of 18% in 2025 on 153 MW of net summer capacity, the 8th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 66 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Notrees Windpower Hybrid | 18% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its wind generators only. Values above 105% are left out of the comparison.
Is the Notrees Windpower Hybrid plant generating more or less than last year?
Generation at Notrees Windpower Hybrid fell 9.0% from 2024 to 2025, from 260,542 MWh to 237,051 MWh. Through August 2026 it is running 17.5% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 260,542 |
| 2025 | 237,051 |
| 2026 through August | 144,248 |
| 2025, same months | 174,777 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 15,562 |
| July 2026 | 17,773 |
| June 2026 | 12,838 |
| May 2026 | 17,698 |
| April 2026 | 9,260 |
| March 2026 | 28,407 |
| February 2026 | 24,081 |
| January 2026 | 18,629 |
| December 2025 | 19,296 |
| November 2025 | 19,367 |
| October 2025 | 10,219 |
| September 2025 | 13,392 |
| August 2025 | 26,079 |
| July 2025 | 17,738 |
| June 2025 | 16,184 |
| May 2025 | 23,326 |
| April 2025 | 16,651 |
| March 2025 | 31,583 |
| February 2025 | 19,649 |
| January 2025 | 23,567 |
| December 2024 | 22,361 |
| November 2024 | 25,488 |
| October 2024 | 28,499 |
| September 2024 | 22,570 |
| August 2024 | 19,512 |
| July 2024 | 14,297 |
| June 2024 | 23,217 |
| May 2024 | 23,509 |
| April 2024 | 18,054 |
| March 2024 | 21,198 |
| February 2024 | 24,840 |
| January 2024 | 16,997 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Notrees Windpower Hybrid plant, and when do they retire?
3 operable generators total 189 MW, with an average age of 15 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 2 | 153 | 81% | none reported |
| 2010s | 1 | 36 | 19% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GE | Operating | Onshore Wind Turbine | 60 | 2009 | n/a |
| VESTA | Operating | Onshore Wind Turbine | 93 | 2009 | n/a |
| BATT | Operating | Batteries | 36 | 2012 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Notrees Windpower Hybrid plant?
2 owners report shares in Notrees Windpower Hybrid; DEGS Wind 1 LLC holds the largest named share, 99.0% or about 187 MW. Deriva Energy operates the plant.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| DEGS Wind 1 LLC | 99.0% | 187 | 234,680 |
| TE Notrees LLC | 1.0% | 2 | 2,371 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
What fuels does the Notrees Windpower Hybrid plant use?
Notrees Windpower Hybrid has capacity on 2 fuels: 81% wind and 19% battery and pumped storage. In 2025, wind made 102% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Wind | 153 | 80.9% | 241,774 |
| Battery and pumped storage | 36 | 19.1% | -4,723 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Notrees Windpower Hybrid plant?
Notrees Windpower Hybrid is in Goldsmith, Ector County, Texas, at 31.9950° N, 102.8283° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Notrees Windpower Hybrid's 153 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Rattlesnake Power, LLC | McCulloch | 160 | 580,986 |
| Gopher Creek Wind Farm | Borden | 158 | 591,691 |
| Fluvanna | Scurry | 155 | 528,946 |
| Notrees Windpower Hybrid | Ector | 153 | 241,774 |
| Trent Wind Farm | Nolan | 152 | 525,650 |
| Century Oak Wind Project, LLC | Eastland | 152 | 525,837 |
| Old Settler Wind | Floyd | 151 | 544,422 |
Source: EIA Forms EIA-860 and EIA-923, 2025.