Wind power plant, Texas

Notrees Windpower Hybrid wind power plant, Texas

Notrees Windpower Hybrid is a 189 MW power plant, 153 MW of it wind, in Ector County, Texas, operated by Deriva Energy, and it generated 237,051 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 8th percentile of U.S. wind plants. By 2025 generation it ranks 2,289th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

189 MWNameplate capacity
18%Capacity factor, 2025, wind units, 8th percentile, on 153 MW net summer
2,289thU.S. rank by generation, 2025
15 yearsAverage generator age, by MW

How hard does the Notrees Windpower Hybrid plant run compared with other wind plants?

The Notrees Windpower Hybrid plant's wind units had a capacity factor of 18% in 2025 on 153 MW of net summer capacity, the 8th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 66 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Notrees Windpower Hybrid18%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its wind generators only. Values above 105% are left out of the comparison.

Is the Notrees Windpower Hybrid plant generating more or less than last year?

Generation at Notrees Windpower Hybrid fell 9.0% from 2024 to 2025, from 260,542 MWh to 237,051 MWh. Through August 2026 it is running 17.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024260,542
2025237,051
2026 through August144,248
2025, same months174,777
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202615,562
July 202617,773
June 202612,838
May 202617,698
April 20269,260
March 202628,407
February 202624,081
January 202618,629
December 202519,296
November 202519,367
October 202510,219
September 202513,392
August 202526,079
July 202517,738
June 202516,184
May 202523,326
April 202516,651
March 202531,583
February 202519,649
January 202523,567
December 202422,361
November 202425,488
October 202428,499
September 202422,570
August 202419,512
July 202414,297
June 202423,217
May 202423,509
April 202418,054
March 202421,198
February 202424,840
January 202416,997

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Notrees Windpower Hybrid plant?

Notrees Windpower Hybrid made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 348th largest of 1,023 plants in Texas, the 1,707th largest of 14,327 in the U.S. and the 427th largest of 1,358 wind plants on its wind units alone. By 2025 generation it is the 429th largest of 816 generating plants in the state.

Notrees Windpower Hybrid within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)189195,9660.1%
Generation (MWh)237,051592,896,1760.0%
Wind capacity (MW)15343,9420.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Notrees Windpower Hybrid plant, and when do they retire?

3 operable generators total 189 MW, with an average age of 15 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s215381%none reported
2010s13619%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEOperatingOnshore Wind Turbine602009n/a
VESTAOperatingOnshore Wind Turbine932009n/a
BATTOperatingBatteries362012n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Notrees Windpower Hybrid plant?

2 owners report shares in Notrees Windpower Hybrid; DEGS Wind 1 LLC holds the largest named share, 99.0% or about 187 MW. Deriva Energy operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
DEGS Wind 1 LLC99.0%187234,680
TE Notrees LLC1.0%22,371

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

What fuels does the Notrees Windpower Hybrid plant use?

Notrees Windpower Hybrid has capacity on 2 fuels: 81% wind and 19% battery and pumped storage. In 2025, wind made 102% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Wind15380.9%241,774
Battery and pumped storage3619.1%-4,723

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Notrees Windpower Hybrid plant?

Notrees Windpower Hybrid is in Goldsmith, Ector County, Texas, at 31.9950° N, 102.8283° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Notrees Windpower Hybrid's 153 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Rattlesnake Power, LLCMcCulloch160580,986
Gopher Creek Wind FarmBorden158591,691
FluvannaScurry155528,946
Notrees Windpower HybridEctor153241,774
Trent Wind FarmNolan152525,650
Century Oak Wind Project, LLCEastland152525,837
Old Settler WindFloyd151544,422

Source: EIA Forms EIA-860 and EIA-923, 2025.