Wind power plant, Texas
Old Settler Wind power plant, Texas
Old Settler Wind is a 151 MW wind power plant in Floyd County, Texas, operated by Old Settler Wind, LLC, and it generated 544,422 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 77th percentile of U.S. wind plants. By 2025 generation it ranks 1,258th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Old Settler Wind plant run compared with other wind plants?
The Old Settler Wind plant had a capacity factor of 41% in 2025 on 151 MW of net summer capacity, the 77th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 150 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Old Settler Wind | 41% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Old Settler Wind plant generating more or less than last year?
Generation at Old Settler Wind fell 0.6% from 2024 to 2025, from 547,652 MWh to 544,422 MWh. Through August 2026 it is running 11.2% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 547,652 |
| 2025 | 544,422 |
| 2026 through August | 403,016 |
| 2025, same months | 362,360 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 47,752 |
| July 2026 | 37,618 |
| June 2026 | 51,913 |
| May 2026 | 48,644 |
| April 2026 | 56,969 |
| March 2026 | 61,354 |
| February 2026 | 48,441 |
| January 2026 | 50,325 |
| December 2025 | 59,005 |
| November 2025 | 47,652 |
| October 2025 | 44,080 |
| September 2025 | 31,325 |
| August 2025 | 37,243 |
| July 2025 | 34,134 |
| June 2025 | 43,243 |
| May 2025 | 42,212 |
| April 2025 | 58,894 |
| March 2025 | 58,449 |
| February 2025 | 40,289 |
| January 2025 | 47,896 |
| December 2024 | 45,969 |
| November 2024 | 51,185 |
| October 2024 | 48,666 |
| September 2024 | 29,557 |
| August 2024 | 36,049 |
| July 2024 | 36,356 |
| June 2024 | 43,506 |
| May 2024 | 48,792 |
| April 2024 | 50,281 |
| March 2024 | 54,053 |
| February 2024 | 60,049 |
| January 2024 | 43,189 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Old Settler Wind plant, and when do they retire?
1 operable generator totals 151 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 151 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| OSWF | Operating | Onshore Wind Turbine | 151 | 2017 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Old Settler Wind plant?
EIA lists no joint owners for Old Settler Wind. Old Settler Wind, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Old Settler Wind plant?
Old Settler Wind is in Floydada, Floyd County, Texas, at 34.0603° N, 101.1876° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Old Settler Wind's 151 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Notrees Windpower Hybrid | Ector | 153 | 241,774 |
| Trent Wind Farm | Nolan | 152 | 525,650 |
| Century Oak Wind Project, LLC | Eastland | 152 | 525,837 |
| Old Settler Wind | Floyd | 151 | 544,422 |
| Peyton Creek Wind Farm LLC | Matagorda | 151 | 363,260 |
| McAdoo Wind Energy LLC | Dickens | 150 | 386,954 |
| Langford Wind Power | Tom Green | 150 | 589,054 |
Source: EIA Forms EIA-860 and EIA-923, 2025.