Old Settler Wind is a 151 MW wind power plant in Floyd County, Texas, operated by Old Settler Wind, LLC, and it generated 544,422 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 77th percentile of U.S. wind plants. By 2025 generation it ranks 1,258th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

151 MWNameplate capacity
41%Capacity factor, 2025, 77th percentile, on 151 MW net summer
0.1%Of TX generation, 2025
8 yearsAverage generator age, by MW

How hard does the Old Settler Wind plant run compared with other wind plants?

The Old Settler Wind plant had a capacity factor of 41% in 2025 on 151 MW of net summer capacity, the 77th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 150 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Old Settler Wind41%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Old Settler Wind plant generating more or less than last year?

Generation at Old Settler Wind fell 0.6% from 2024 to 2025, from 547,652 MWh to 544,422 MWh. Through August 2026 it is running 11.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024547,652
2025544,422
2026 through August403,016
2025, same months362,360
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202647,752
July 202637,618
June 202651,913
May 202648,644
April 202656,969
March 202661,354
February 202648,441
January 202650,325
December 202559,005
November 202547,652
October 202544,080
September 202531,325
August 202537,243
July 202534,134
June 202543,243
May 202542,212
April 202558,894
March 202558,449
February 202540,289
January 202547,896
December 202445,969
November 202451,185
October 202448,666
September 202429,557
August 202436,049
July 202436,356
June 202443,506
May 202448,792
April 202450,281
March 202454,053
February 202460,049
January 202443,189

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Old Settler Wind plant?

Old Settler Wind made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. By capacity it is the 406th largest of 1,023 plants in Texas, the 1,958th largest of 14,327 in the U.S. and the 436th largest of 1,358 wind plants. By 2025 generation it is the 257th largest of 816 generating plants in the state.

Old Settler Wind within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)151195,9660.1%
Generation (MWh)544,422592,896,1760.1%
Wind capacity (MW)15143,9420.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Old Settler Wind plant, and when do they retire?

1 operable generator totals 151 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1151100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
OSWFOperatingOnshore Wind Turbine1512017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Old Settler Wind plant?

EIA lists no joint owners for Old Settler Wind. Old Settler Wind, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Old Settler Wind plant?

Old Settler Wind is in Floydada, Floyd County, Texas, at 34.0603° N, 101.1876° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Old Settler Wind's 151 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
Notrees Windpower HybridEctor153241,774
Trent Wind FarmNolan152525,650
Century Oak Wind Project, LLCEastland152525,837
Old Settler WindFloyd151544,422
Peyton Creek Wind Farm LLCMatagorda151363,260
McAdoo Wind Energy LLCDickens150386,954
Langford Wind PowerTom Green150589,054