Wind power plant, Texas

Century Oak Wind Project, LLC power plant, Texas

Century Oak Wind Project, LLC is a 152 MW wind power plant in Eastland County, Texas, operated by Century Oak Wind Project, LLC, and it generated 525,837 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 71st percentile of U.S. wind plants. By 2025 generation it ranks 1,291st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

152 MWNameplate capacity
40%Capacity factor, 2025, 71st percentile, on 152 MW net summer
0.1%Of TX generation, 2025
1 yearAverage generator age, by MW

How hard does the Century Oak Wind Project, LLC plant run compared with other wind plants?

The Century Oak Wind Project, LLC plant had a capacity factor of 40% in 2025 on 152 MW of net summer capacity, the 71st percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 145 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Century Oak Wind Project, LLC40%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Century Oak Wind Project, LLC plant generating more or less than last year?

Century Oak Wind Project, LLC generated 525,837 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 9.4% ahead of the same months of 2025. 2024 has output for only 6 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024222,509
2025525,837
2026 through August390,794
2025, same months357,341
Monthly generation, Jul 2024 to Aug 2026
MonthMWh
August 202643,181
July 202639,991
June 202659,378
May 202644,436
April 202654,718
March 202668,351
February 202638,982
January 202641,757
December 202552,178
November 202537,034
October 202546,273
September 202533,011
August 202530,731
July 202540,425
June 202550,355
May 202540,349
April 202555,503
March 202560,386
February 202540,310
January 202539,282
December 202437,476
November 202442,061
October 202445,597
September 202422,263
August 202436,305
July 202438,807

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Century Oak Wind Project, LLC plant?

Century Oak Wind Project, LLC made 0.1% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. By capacity it is the 405th largest of 1,023 plants in Texas, the 1,956th largest of 14,327 in the U.S. and the 433rd largest of 1,358 wind plants. By 2025 generation it is the 271st largest of 816 generating plants in the state.

Century Oak Wind Project, LLC within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)152195,9660.1%
Generation (MWh)525,837592,896,1760.1%
Wind capacity (MW)15243,9420.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Century Oak Wind Project, LLC plant, and when do they retire?

1 operable generator totals 152 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1152100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
COAKWOperatingOnshore Wind Turbine1522024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Century Oak Wind Project, LLC plant?

EIA lists no joint owners for Century Oak Wind Project, LLC. Century Oak Wind Project, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Century Oak Wind Project, LLC plant?

Century Oak Wind Project, LLC is in Cisco, Eastland County, Texas, at 32.4287° N, 99.1591° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Texas are similar in size?

Texas has 228 operable wind plants with 43,942 MW of capacity, and Century Oak Wind Project, LLC's 152 MW is 0% of that.

Wind plants in Texas around this size
PlantCountyMW2025 MWh
FluvannaScurry155528,946
Notrees Windpower HybridEctor153241,774
Trent Wind FarmNolan152525,650
Century Oak Wind Project, LLCEastland152525,837
Old Settler WindFloyd151544,422
Peyton Creek Wind Farm LLCMatagorda151363,260
McAdoo Wind Energy LLCDickens150386,954

Source: EIA Forms EIA-860 and EIA-923, 2025.