Wind power plant, Texas
McAdoo Wind Energy LLC power plant, Texas
McAdoo Wind Energy LLC is a 150 MW wind power plant in Dickens County, Texas, operated by Invenergy Services LLC, and it generated 386,954 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 37th percentile of U.S. wind plants. By 2025 generation it ranks 1,629th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the McAdoo Wind Energy LLC plant run compared with other wind plants?
The McAdoo Wind Energy LLC plant had a capacity factor of 29% in 2025 on 150 MW of net summer capacity, the 37th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 107 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| McAdoo Wind Energy LLC | 29% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the McAdoo Wind Energy LLC plant generating more or less than last year?
Generation at McAdoo Wind Energy LLC rose 6.4% from 2024 to 2025, from 363,622 MWh to 386,954 MWh.
| Period | MWh |
|---|---|
| 2024 | 363,622 |
| 2025 | 386,954 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 46,289 |
| November 2025 | 29,753 |
| October 2025 | 22,566 |
| September 2025 | 27,804 |
| August 2025 | 31,922 |
| July 2025 | 29,029 |
| June 2025 | 30,343 |
| May 2025 | 34,315 |
| April 2025 | 39,560 |
| March 2025 | 31,162 |
| February 2025 | 29,063 |
| January 2025 | 35,148 |
| December 2024 | 34,352 |
| November 2024 | 24,120 |
| October 2024 | 30,303 |
| September 2024 | 26,504 |
| August 2024 | 32,420 |
| July 2024 | 29,662 |
| June 2024 | 29,809 |
| May 2024 | 29,112 |
| April 2024 | 30,855 |
| March 2024 | 31,740 |
| February 2024 | 36,657 |
| January 2024 | 28,088 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the McAdoo Wind Energy LLC plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 150 | 2008 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the McAdoo Wind Energy LLC plant?
EIA lists no joint owners for McAdoo Wind Energy LLC. Invenergy Services LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the McAdoo Wind Energy LLC plant?
McAdoo Wind Energy LLC is in McAdoo, Dickens County, Texas, at 33.7522° N, 100.9674° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and McAdoo Wind Energy LLC's 150 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Century Oak Wind Project, LLC | Eastland | 152 | 525,837 |
| Old Settler Wind | Floyd | 151 | 544,422 |
| Peyton Creek Wind Farm LLC | Matagorda | 151 | 363,260 |
| McAdoo Wind Energy LLC | Dickens | 150 | 386,954 |
| Langford Wind Power | Tom Green | 150 | 589,054 |
| Loraine Windpark Project LLC | Mitchell | 150 | 327,923 |
| Senate Wind LLC | Jack | 150 | 393,732 |
Source: EIA Forms EIA-860 and EIA-923, 2025.