Wind power plant, Texas
Langford Wind Power power plant, Texas
Langford Wind Power is a 150 MW wind power plant in Tom Green County, Texas, operated by Langford Wind Power LLC, and it generated 589,054 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 90th percentile of U.S. wind plants. By 2025 generation it ranks 1,145th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Langford Wind Power plant run compared with other wind plants?
The Langford Wind Power plant had a capacity factor of 45% in 2025 on 150 MW of net summer capacity, the 90th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 164 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Langford Wind Power | 45% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Langford Wind Power plant generating more or less than last year?
Generation at Langford Wind Power rose 2.8% from 2024 to 2025, from 572,942 MWh to 589,054 MWh.
| Period | MWh |
|---|---|
| 2024 | 572,942 |
| 2025 | 589,054 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 60,811 |
| November 2025 | 50,137 |
| October 2025 | 49,703 |
| September 2025 | 34,837 |
| August 2025 | 34,852 |
| July 2025 | 44,303 |
| June 2025 | 58,862 |
| May 2025 | 43,549 |
| April 2025 | 56,894 |
| March 2025 | 60,119 |
| February 2025 | 49,781 |
| January 2025 | 45,206 |
| December 2024 | 48,932 |
| November 2024 | 54,600 |
| October 2024 | 53,307 |
| September 2024 | 19,155 |
| August 2024 | 38,293 |
| July 2024 | 40,768 |
| June 2024 | 48,721 |
| May 2024 | 50,430 |
| April 2024 | 61,337 |
| March 2024 | 52,291 |
| February 2024 | 59,248 |
| January 2024 | 45,860 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Langford Wind Power plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 150 | 2009 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Langford Wind Power plant?
EIA lists no joint owners for Langford Wind Power. Langford Wind Power LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Langford Wind Power plant?
Langford Wind Power is in Christoval, Tom Green County, Texas, at 31.0854° N, 100.6788° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Langford Wind Power's 150 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Old Settler Wind | Floyd | 151 | 544,422 |
| Peyton Creek Wind Farm LLC | Matagorda | 151 | 363,260 |
| McAdoo Wind Energy LLC | Dickens | 150 | 386,954 |
| Langford Wind Power | Tom Green | 150 | 589,054 |
| Loraine Windpark Project LLC | Mitchell | 150 | 327,923 |
| Senate Wind LLC | Jack | 150 | 393,732 |
| Goldthwaite Wind Energy Facility | Mills | 150 | 408,631 |
Source: EIA Forms EIA-860 and EIA-923, 2025.