Loraine Windpark Project LLC is a 150 MW wind power plant in Mitchell County, Texas, operated by Loraine Windpower Project, and it generated 327,923 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 23rd percentile of U.S. wind plants. By 2025 generation it ranks 1,855th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Loraine Windpark Project LLC plant run compared with other wind plants?
The Loraine Windpark Project LLC plant had a capacity factor of 25% in 2025 on 149 MW of net summer capacity, the 23rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 92 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Loraine Windpark Project LLC | 25% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Loraine Windpark Project LLC plant generating more or less than last year?
Generation at Loraine Windpark Project LLC rose 6.5% from 2024 to 2025, from 307,802 MWh to 327,923 MWh.
| Period | MWh |
|---|---|
| 2024 | 307,802 |
| 2025 | 327,923 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 29,682 |
| November 2025 | 24,125 |
| October 2025 | 27,738 |
| September 2025 | 21,722 |
| August 2025 | 23,987 |
| July 2025 | 26,808 |
| June 2025 | 37,287 |
| May 2025 | 31,382 |
| April 2025 | 36,437 |
| March 2025 | 19,948 |
| February 2025 | 24,133 |
| January 2025 | 24,674 |
| December 2024 | 24,796 |
| November 2024 | 25,652 |
| October 2024 | 20,643 |
| September 2024 | 17,808 |
| August 2024 | 23,171 |
| July 2024 | 22,652 |
| June 2024 | 32,371 |
| May 2024 | 34,008 |
| April 2024 | 30,795 |
| March 2024 | 26,547 |
| February 2024 | 27,547 |
| January 2024 | 21,812 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Loraine Windpark Project LLC plant, and when do they retire?
2 operable generators total 150 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 2 | 150 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| LWG1 | Operating | Onshore Wind Turbine | 75 | 2009 | n/a |
| LWG2 | Operating | Onshore Wind Turbine | 75 | 2009 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Loraine Windpark Project LLC plant?
EIA lists no joint owners for Loraine Windpark Project LLC. Loraine Windpower Project operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Loraine Windpark Project LLC plant?
Loraine Windpark Project LLC is in Loraine, Mitchell County, Texas, at 32.4375° N, 100.7444° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Loraine Windpark Project LLC's 150 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Peyton Creek Wind Farm LLC | Matagorda | 151 | 363,260 |
| McAdoo Wind Energy LLC | Dickens | 150 | 386,954 |
| Langford Wind Power | Tom Green | 150 | 589,054 |
| Loraine Windpark Project LLC | Mitchell | 150 | 327,923 |
| Senate Wind LLC | Jack | 150 | 393,732 |
| Goldthwaite Wind Energy Facility | Mills | 150 | 408,631 |
| Route 66 Wind Plant | Carson | 150 | 552,481 |