Granite Mountain Solar West, LLC is a 50.4 MW solar power plant in Iron County, Utah, operated by Clearway Renewable Operation & Maintenance LLC, and it generated 125,158 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Utah, and its capacity factor sits at the 84th percentile of U.S. solar plants. By 2025 generation it ranks 3,145th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

50.4 MWNameplate capacity
28%Capacity factor, 2025, 84th percentile, on 50.4 MW net summer
0.3%Of UT generation, 2025
9 yearsAverage generator age, by MW

How hard does the Granite Mountain Solar West, LLC plant run compared with other solar plants?

The Granite Mountain Solar West, LLC plant had a capacity factor of 28% in 2025 on 50.4 MW of net summer capacity, the 84th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 103 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Granite Mountain Solar West, LLC28%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Granite Mountain Solar West, LLC plant generating more or less than last year?

Generation at Granite Mountain Solar West, LLC fell 2.4% from 2024 to 2025, from 128,188 MWh to 125,158 MWh. Through August 2026 it is running 4.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024128,188
2025125,158
2026 through August86,834
2025, same months91,097
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202611,819
July 202614,584
June 20265,809
May 202615,182
April 202612,748
March 202611,923
February 20267,972
January 20266,797
December 20255,932
November 20256,438
October 202510,499
September 202511,192
August 202512,991
July 202514,657
June 202515,258
May 202513,883
April 202511,868
March 20256,855
February 20258,551
January 20257,034
December 20246,297
November 20246,939
October 20249,567
September 202411,515
August 202413,723
July 202413,584
June 202415,714
May 202415,590
April 202413,117
March 20249,834
February 20246,916
January 20245,392

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from the Granite Mountain Solar West, LLC plant?

Granite Mountain Solar West, LLC made 0.3% of the 38,124,679 MWh reported by Utah plants in 2025, from 0.5% of the state's 11,140 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 42nd largest of 126 plants in Utah, the 3,739th largest of 14,327 in the U.S. and the 860th largest of 7,223 solar plants. By 2025 generation it is the 45th largest of 117 generating plants in the state.

Granite Mountain Solar West, LLC within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)5011,1400.5%
Generation (MWh)125,15838,124,6790.3%
Solar capacity (MW)503,0371.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Granite Mountain Solar West, LLC plant, and when do they retire?

1 operable generator totals 50.4 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GMSWOperatingSolar Photovoltaic502016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Granite Mountain Solar West, LLC plant?

Clearway Energy, Inc is the only joint owner reported for Granite Mountain Solar West, LLC, with 100.0%. Clearway Renewable Operation & Maintenance LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Granite Mountain Solar West, LLC plant?

Granite Mountain Solar West, LLC is in Cedar City, Iron County, Utah, at 37.7989° N, 113.3220° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Utah are similar in size?

Utah has 55 operable solar plants with 3,037 MW of capacity, and Granite Mountain Solar West, LLC's 50.4 MW is 2% of that.

Solar plants in Utah around this size
PlantCountyMW2025 MWh
Red Mesa Solar ProjectSan Juan72188,362
Cove Mountain SolarIron58158,955
Sage Solar I-IIIRich58136,607
Granite Mountain Solar West, LLCIron50125,158
Pavant Solar, LLCMillard50114,348
Pavant Solar II LLCMillard5085,894
Castle Solar, LLCEmery40107,994