Red Mesa Solar Project, Utah

Red Mesa Solar Project is a 72 MW solar power plant in San Juan County, Utah, operated by NTUA Generation-Utah, LLC, and it generated 188,362 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Utah, and its capacity factor sits at the 90th percentile of U.S. solar plants. By 2025 generation it ranks 2,574th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

72 MWNameplate capacity
30%Capacity factor, 2025, 90th percentile, on 72 MW net summer
0.5%Of UT generation, 2025
2 yearsAverage generator age, by MW

How hard does the Red Mesa Solar Project plant run compared with other solar plants?

The Red Mesa Solar Project plant had a capacity factor of 30% in 2025 on 72 MW of net summer capacity, the 90th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 109 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Red Mesa Solar Project30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Red Mesa Solar Project plant generating more or less than last year?

Generation at Red Mesa Solar Project fell 1.7% from 2024 to 2025, from 191,666 MWh to 188,362 MWh. Through August 2026 it is running 0.6% behind the same months of 2025.

Net generation by period
PeriodMWh
2024191,666
2025188,362
2026 through August139,547
2025, same months140,435
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202618,257
July 202620,082
June 202621,458
May 202620,229
April 202618,960
March 202618,060
February 202611,979
January 202610,522
December 20259,260
November 20259,732
October 202514,476
September 202514,459
August 202517,532
July 202516,955
June 202521,305
May 202521,858
April 202519,974
March 202517,172
February 202513,798
January 202511,841
December 202410,495
November 202411,353
October 202414,412
September 202417,642
August 202416,320
July 202419,786
June 202418,682
May 202422,547
April 202420,527
March 202416,700
February 202412,530
January 202410,672

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from the Red Mesa Solar Project plant?

Red Mesa Solar Project made 0.5% of the 38,124,679 MWh reported by Utah plants in 2025, from 0.6% of the state's 11,140 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 37th largest of 126 plants in Utah, the 3,313th largest of 14,327 in the U.S. and the 757th largest of 7,223 solar plants. By 2025 generation it is the 36th largest of 117 generating plants in the state.

Red Mesa Solar Project within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)7211,1400.6%
Generation (MWh)188,36238,124,6790.5%
Solar capacity (MW)723,0372.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Red Mesa Solar Project plant, and when do they retire?

1 operable generator totals 72 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s172100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PVOperatingSolar Photovoltaic722023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Red Mesa Solar Project plant?

EIA lists no joint owners for Red Mesa Solar Project. NTUA Generation-Utah, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Red Mesa Solar Project plant?

Red Mesa Solar Project is in Red Mesa, San Juan County, Utah, at 37.1208° N, 109.4115° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Utah are similar in size?

Utah has 55 operable solar plants with 3,037 MW of capacity, and Red Mesa Solar Project's 72 MW is 2% of that.

Solar plants in Utah around this size
PlantCountyMW2025 MWh
Elektron Solar, LLCTooele80212,146
Steel Solar LLCBox Elder80198,294
Horseshoe Solar, LLCTooele75195,821
Red Mesa Solar ProjectSan Juan72188,362
Cove Mountain SolarIron58158,955
Sage Solar I-IIIRich58136,607
Granite Mountain Solar West, LLCIron50125,158