Solar power plant, Utah
Horseshoe Solar, LLC power plant, Utah
Horseshoe Solar, LLC is a 75 MW solar power plant in Tooele County, Utah, operated by Horseshoe Solar, LLC, and it generated 195,821 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Utah, and its capacity factor sits at the 90th percentile of U.S. solar plants. By 2025 generation it ranks 2,524th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Horseshoe Solar, LLC plant run compared with other solar plants?
The Horseshoe Solar, LLC plant had a capacity factor of 30% in 2025 on 75 MW of net summer capacity, the 90th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 109 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Horseshoe Solar, LLC | 30% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Horseshoe Solar, LLC plant generating more or less than last year?
Horseshoe Solar, LLC generated 195,821 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 2.5% behind the same months of 2025. 2024 has output for only 8 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 135,162 |
| 2025 | 195,821 |
| 2026 through August | 144,072 |
| 2025, same months | 147,812 |
Monthly generation, May 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 19,439 |
| July 2026 | 21,814 |
| June 2026 | 24,613 |
| May 2026 | 22,950 |
| April 2026 | 18,892 |
| March 2026 | 16,837 |
| February 2026 | 10,017 |
| January 2026 | 9,510 |
| December 2025 | 7,004 |
| November 2025 | 9,246 |
| October 2025 | 14,283 |
| September 2025 | 17,476 |
| August 2025 | 21,393 |
| July 2025 | 24,094 |
| June 2025 | 24,759 |
| May 2025 | 22,389 |
| April 2025 | 20,170 |
| March 2025 | 15,294 |
| February 2025 | 10,218 |
| January 2025 | 9,495 |
| December 2024 | 7,259 |
| November 2024 | 9,165 |
| October 2024 | 14,807 |
| September 2024 | 16,834 |
| August 2024 | 18,784 |
| July 2024 | 23,459 |
| June 2024 | 21,765 |
| May 2024 | 23,089 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Horseshoe Solar, LLC plant, and when do they retire?
1 operable generator totals 75 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 75 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| HSS | Operating | Solar Photovoltaic | 75 | 2024 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Horseshoe Solar, LLC plant?
EIA lists no joint owners for Horseshoe Solar, LLC. Horseshoe Solar, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Horseshoe Solar, LLC plant?
Horseshoe Solar, LLC is in Tooele, Tooele County, Utah, at 40.7183° N, 112.6658° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Utah are similar in size?
Utah has 55 operable solar plants with 3,037 MW of capacity, and Horseshoe Solar, LLC's 75 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Graphite Solar I | Carbon | 80 | 188,129 |
| Elektron Solar, LLC | Tooele | 80 | 212,146 |
| Steel Solar LLC | Box Elder | 80 | 198,294 |
| Horseshoe Solar, LLC | Tooele | 75 | 195,821 |
| Red Mesa Solar Project | San Juan | 72 | 188,362 |
| Cove Mountain Solar | Iron | 58 | 158,955 |
| Sage Solar I-III | Rich | 58 | 136,607 |
Source: EIA Forms EIA-860 and EIA-923, 2025.