Solar power plant, Utah

Graphite Solar I power plant, Utah

Graphite Solar I is a 80 MW solar power plant in Carbon County, Utah, operated by Greenbacker Renewable Energy Corporation, and it generated 188,129 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Utah, and its capacity factor sits at the 77th percentile of U.S. solar plants. By 2025 generation it ranks 2,577th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

80 MWNameplate capacity
27%Capacity factor, 2025, 77th percentile, on 80 MW net summer
0.5%Of UT generation, 2025
3 yearsAverage generator age, by MW

How hard does the Graphite Solar I plant run compared with other solar plants?

The Graphite Solar I plant had a capacity factor of 27% in 2025 on 80 MW of net summer capacity, the 77th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 98 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Graphite Solar I27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Graphite Solar I plant generating more or less than last year?

Generation at Graphite Solar I fell 2.6% from 2024 to 2025, from 193,130 MWh to 188,129 MWh. Through August 2026 it is running 17.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024193,130
2025188,129
2026 through August115,696
2025, same months139,360
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202618,763
July 202619,909
June 202611,445
May 20262,259
April 202619,540
March 202619,803
February 202613,103
January 202610,874
December 20254,385
November 202511,456
October 202515,940
September 202516,988
August 202520,132
July 202523,317
June 202519,055
May 202521,234
April 202513,286
March 202515,773
February 202513,220
January 202513,343
December 202410,892
November 202411,832
October 202415,535
September 202419,418
August 202412,324
July 202423,324
June 202422,349
May 202419,048
April 202421,315
March 202416,551
February 202411,206
January 20249,336

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from the Graphite Solar I plant?

Graphite Solar I made 0.5% of the 38,124,679 MWh reported by Utah plants in 2025, from 0.7% of the state's 11,140 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 21st largest of 126 plants in Utah, the 2,965th largest of 14,327 in the U.S. and the 549th largest of 7,223 solar plants. By 2025 generation it is the 37th largest of 117 generating plants in the state.

Graphite Solar I within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)8011,1400.7%
Generation (MWh)188,12938,124,6790.5%
Solar capacity (MW)803,0372.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Graphite Solar I plant, and when do they retire?

1 operable generator totals 80 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s180100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
394OperatingSolar Photovoltaic802022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Graphite Solar I plant?

EIA lists no joint owners for Graphite Solar I. Greenbacker Renewable Energy Corporation operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Graphite Solar I plant?

Graphite Solar I is in Wellington, Carbon County, Utah, at 39.5484° N, 110.7121° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Utah are similar in size?

Utah has 55 operable solar plants with 3,037 MW of capacity, and Graphite Solar I's 80 MW is 3% of that.

Solar plants in Utah around this size
PlantCountyMW2025 MWh
Sigurd Solar LLCSevier80199,973
Clover Creek Solar Community SolarJuab80196,528
Rocket Solar, LLCBox Elder80210,534
Graphite Solar ICarbon80188,129
Elektron Solar, LLCTooele80212,146
Steel Solar LLCBox Elder80198,294
Horseshoe Solar, LLCTooele75195,821

Source: EIA Forms EIA-860 and EIA-923, 2025.