Solar power plant, Utah
Sigurd Solar LLC power plant, Utah
Sigurd Solar LLC is a 80 MW solar power plant in Sevier County, Utah, operated by Sigurd Solar LLC, and it generated 199,973 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Utah, and its capacity factor sits at the 85th percentile of U.S. solar plants. By 2025 generation it ranks 2,490th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Sigurd Solar LLC plant run compared with other solar plants?
The Sigurd Solar LLC plant had a capacity factor of 29% in 2025 on 80 MW of net summer capacity, the 85th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 104 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Sigurd Solar LLC | 29% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Sigurd Solar LLC plant generating more or less than last year?
Generation at Sigurd Solar LLC rose 0.3% from 2024 to 2025, from 199,326 MWh to 199,973 MWh. Through August 2026 it is running 6.7% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 199,326 |
| 2025 | 199,973 |
| 2026 through August | 156,290 |
| 2025, same months | 146,474 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 18,487 |
| July 2026 | 21,842 |
| June 2026 | 25,918 |
| May 2026 | 23,281 |
| April 2026 | 20,927 |
| March 2026 | 20,228 |
| February 2026 | 13,172 |
| January 2026 | 12,435 |
| December 2025 | 8,097 |
| November 2025 | 9,895 |
| October 2025 | 17,038 |
| September 2025 | 18,469 |
| August 2025 | 18,869 |
| July 2025 | 23,255 |
| June 2025 | 24,727 |
| May 2025 | 19,962 |
| April 2025 | 19,168 |
| March 2025 | 16,761 |
| February 2025 | 12,747 |
| January 2025 | 10,985 |
| December 2024 | 9,430 |
| November 2024 | 10,248 |
| October 2024 | 14,600 |
| September 2024 | 16,481 |
| August 2024 | 21,996 |
| July 2024 | 24,995 |
| June 2024 | 23,036 |
| May 2024 | 22,530 |
| April 2024 | 20,905 |
| March 2024 | 14,703 |
| February 2024 | 11,523 |
| January 2024 | 8,879 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Sigurd Solar LLC plant, and when do they retire?
1 operable generator totals 80 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 80 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| SGSOL | Operating | Solar Photovoltaic | 80 | 2021 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Sigurd Solar LLC plant?
EIA lists no joint owners for Sigurd Solar LLC. Sigurd Solar LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Sigurd Solar LLC plant?
Sigurd Solar LLC is in Sigurd, Sevier County, Utah, at 38.8505° N, 112.0052° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Utah are similar in size?
Utah has 55 operable solar plants with 3,037 MW of capacity, and Sigurd Solar LLC's 80 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Iron Springs Solar, LLC | Iron | 80 | 213,555 |
| Granite Mountain Solar East, LLC | Iron | 80 | 203,111 |
| Three Peaks Power | Iron | 80 | 225,757 |
| Sigurd Solar LLC | Sevier | 80 | 199,973 |
| Clover Creek Solar Community Solar | Juab | 80 | 196,528 |
| Rocket Solar, LLC | Box Elder | 80 | 210,534 |
| Graphite Solar I | Carbon | 80 | 188,129 |
Source: EIA Forms EIA-860 and EIA-923, 2025.