Solar power plant, Utah

Iron Springs Solar, LLC power plant, Utah

Iron Springs Solar, LLC is a 80 MW solar power plant in Iron County, Utah, operated by Clearway Renewable Operation & Maintenance LLC, and it generated 213,555 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Utah, and its capacity factor sits at the 93rd percentile of U.S. solar plants. By 2025 generation it ranks 2,399th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

80 MWNameplate capacity
30%Capacity factor, 2025, 93rd percentile, on 80 MW net summer
0.6%Of UT generation, 2025
9 yearsAverage generator age, by MW

How hard does the Iron Springs Solar, LLC plant run compared with other solar plants?

The Iron Springs Solar, LLC plant had a capacity factor of 30% in 2025 on 80 MW of net summer capacity, the 93rd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 111 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Iron Springs Solar, LLC30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Iron Springs Solar, LLC plant generating more or less than last year?

Generation at Iron Springs Solar, LLC rose 0.4% from 2024 to 2025, from 212,759 MWh to 213,555 MWh. Through August 2026 it is running 1.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024212,759
2025213,555
2026 through August155,061
2025, same months156,655
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202613,757
July 202623,245
June 202626,510
May 202625,185
April 202621,862
March 202620,257
February 202612,909
January 202611,336
December 20259,851
November 202510,688
October 202517,411
September 202518,950
August 202521,472
July 202524,564
June 202524,753
May 202522,139
April 202520,196
March 202517,360
February 202514,300
January 202511,871
December 202410,529
November 202411,421
October 202416,182
September 202420,018
August 202422,297
July 202423,999
June 202425,537
May 202424,694
April 202421,084
March 202415,874
February 202411,380
January 20249,744

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from the Iron Springs Solar, LLC plant?

Iron Springs Solar, LLC made 0.6% of the 38,124,679 MWh reported by Utah plants in 2025, from 0.7% of the state's 11,140 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 21st largest of 126 plants in Utah, the 2,965th largest of 14,327 in the U.S. and the 529th largest of 7,223 solar plants. By 2025 generation it is the 22nd largest of 117 generating plants in the state.

Iron Springs Solar, LLC within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)8011,1400.7%
Generation (MWh)213,55538,124,6790.6%
Solar capacity (MW)803,0372.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Iron Springs Solar, LLC plant, and when do they retire?

1 operable generator totals 80 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s180100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ISSOperatingSolar Photovoltaic802016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Iron Springs Solar, LLC plant?

Clearway Energy, Inc is the only joint owner reported for Iron Springs Solar, LLC, with 100.0%. Clearway Renewable Operation & Maintenance LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Iron Springs Solar, LLC plant?

Iron Springs Solar, LLC is in Cedar City, Iron County, Utah, at 37.7212° N, 113.1516° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Utah are similar in size?

Utah has 55 operable solar plants with 3,037 MW of capacity, and Iron Springs Solar, LLC's 80 MW is 3% of that.

Solar plants in Utah around this size
PlantCountyMW2025 MWh
Escalante Solar I, LLCBeaver80211,535
Escalante Solar II, LLCBeaver80211,610
Escalante Solar III, LLCBeaver80208,628
Iron Springs Solar, LLCIron80213,555
Granite Mountain Solar East, LLCIron80203,111
Three Peaks PowerIron80225,757
Sigurd Solar LLCSevier80199,973

Source: EIA Forms EIA-860 and EIA-923, 2025.