Solar power plant, Utah
Three Peaks Power solar power plant, Utah
Three Peaks Power is a 80 MW solar power plant in Iron County, Utah, operated by Onward Energy, and it generated 225,757 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Utah, and its capacity factor sits at the 97th percentile of U.S. solar plants. By 2025 generation it ranks 2,340th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Three Peaks Power plant run compared with other solar plants?
The Three Peaks Power plant had a capacity factor of 32% in 2025 on 80 MW of net summer capacity, the 97th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 118 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Three Peaks Power | 32% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Three Peaks Power plant generating more or less than last year?
Generation at Three Peaks Power rose 7.9% from 2024 to 2025, from 209,166 MWh to 225,757 MWh. Through August 2026 it is running 0.4% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 209,166 |
| 2025 | 225,757 |
| 2026 through August | 164,353 |
| 2025, same months | 165,057 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 20,962 |
| July 2026 | 23,357 |
| June 2026 | 27,088 |
| May 2026 | 25,873 |
| April 2026 | 22,364 |
| March 2026 | 18,387 |
| February 2026 | 14,109 |
| January 2026 | 12,213 |
| December 2025 | 10,514 |
| November 2025 | 11,380 |
| October 2025 | 18,527 |
| September 2025 | 20,279 |
| August 2025 | 22,771 |
| July 2025 | 26,164 |
| June 2025 | 26,113 |
| May 2025 | 23,712 |
| April 2025 | 21,518 |
| March 2025 | 17,161 |
| February 2025 | 15,231 |
| January 2025 | 12,387 |
| December 2024 | 10,978 |
| November 2024 | 12,283 |
| October 2024 | 17,251 |
| September 2024 | 21,197 |
| August 2024 | 24,032 |
| July 2024 | 25,455 |
| June 2024 | 26,826 |
| May 2024 | 26,184 |
| April 2024 | 22,589 |
| March 2024 | 9,722 |
| February 2024 | 6,956 |
| January 2024 | 5,693 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Three Peaks Power plant, and when do they retire?
1 operable generator totals 80 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 80 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| TPP | Operating | Solar Photovoltaic | 80 | 2016 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Three Peaks Power plant?
CRE-Three Peaks Utah LLC is the only joint owner reported for Three Peaks Power, with 100.0%. Onward Energy operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Three Peaks Power plant?
Three Peaks Power is in Cedar City, Iron County, Utah, at 37.8271° N, 113.1371° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Utah are similar in size?
Utah has 55 operable solar plants with 3,037 MW of capacity, and Three Peaks Power's 80 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Escalante Solar III, LLC | Beaver | 80 | 208,628 |
| Iron Springs Solar, LLC | Iron | 80 | 213,555 |
| Granite Mountain Solar East, LLC | Iron | 80 | 203,111 |
| Three Peaks Power | Iron | 80 | 225,757 |
| Sigurd Solar LLC | Sevier | 80 | 199,973 |
| Clover Creek Solar Community Solar | Juab | 80 | 196,528 |
| Rocket Solar, LLC | Box Elder | 80 | 210,534 |
Source: EIA Forms EIA-860 and EIA-923, 2025.