Skip to main content
RateWatt

Solar power plant, Utah

Escalante Solar III, LLC power plant, Utah

Escalante Solar III, LLC is a 80 MW solar power plant in Beaver County, Utah, operated by Clearway Renewable Operation & Maintenance LLC, and it generated 208,628 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Utah, and its capacity factor sits at the 89th percentile of U.S. solar plants. By 2025 generation it ranks 2,427th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

80 MWNameplate capacity
30%Capacity factor, 2025, 89th percentile, on 80 MW net summer
0.5%Of UT generation, 2025
9 yearsAverage generator age, by MW

How hard does the Escalante Solar III, LLC plant run compared with other solar plants?

The Escalante Solar III, LLC plant had a capacity factor of 30% in 2025 on 80 MW of net summer capacity, the 89th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 109 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Escalante Solar III, LLC30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Escalante Solar III, LLC plant generating more or less than last year?

Generation at Escalante Solar III, LLC fell 0.1% from 2024 to 2025, from 208,907 MWh to 208,628 MWh. Through August 2026 it is running 4.3% behind the same months of 2025.

Net generation by period
PeriodMWh
2024208,907
2025208,628
2026 through August148,031
2025, same months154,665
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202617,222
July 202617,463
June 202624,855
May 202623,546
April 202620,797
March 202619,805
February 202612,537
January 202611,806
December 20258,902
November 202510,262
October 202516,572
September 202518,227
August 202521,770
July 202524,588
June 202525,144
May 202522,438
April 202519,923
March 202516,736
February 202513,109
January 202510,957
December 20249,756
November 202411,265
October 202416,116
September 202420,040
August 202421,648
July 202424,463
June 202424,499
May 202423,828
April 202421,254
March 202415,498
February 202411,611
January 20248,929

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from the Escalante Solar III, LLC plant?

Escalante Solar III, LLC made 0.5% of the 38,124,679 MWh reported by Utah plants in 2025, from 0.7% of the state's 11,140 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 21st largest of 126 plants in Utah, the 2,965th largest of 14,327 in the U.S. and the 527th largest of 7,223 solar plants. By 2025 generation it is the 27th largest of 117 generating plants in the state.

Escalante Solar III, LLC within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)8011,1400.7%
Generation (MWh)208,62838,124,6790.5%
Solar capacity (MW)803,0372.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Escalante Solar III, LLC plant, and when do they retire?

1 operable generator totals 80 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s180100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ESCS3OperatingSolar Photovoltaic802016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Escalante Solar III, LLC plant?

Clearway Energy, Inc is the only joint owner reported for Escalante Solar III, LLC, with 100.0%. Clearway Renewable Operation & Maintenance LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Escalante Solar III, LLC plant?

Escalante Solar III, LLC is in Milford, Beaver County, Utah, at 38.4978° N, 112.9869° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Utah are similar in size?

Utah has 55 operable solar plants with 3,037 MW of capacity, and Escalante Solar III, LLC's 80 MW is 3% of that.

Solar plants in Utah around this size
PlantCountyMW2025 MWh
Enterprise Solar, LLCIron80219,349
Escalante Solar I, LLCBeaver80211,535
Escalante Solar II, LLCBeaver80211,610
Escalante Solar III, LLCBeaver80208,628
Iron Springs Solar, LLCIron80213,555
Granite Mountain Solar East, LLCIron80203,111
Three Peaks PowerIron80225,757

Source: EIA Forms EIA-860 and EIA-923, 2025.