Skip to main content
RateWatt

Solar power plant, Utah

Granite Mountain Solar East, LLC power plant, Utah

Granite Mountain Solar East, LLC is a 80 MW solar power plant in Iron County, Utah, operated by Clearway Renewable Operation & Maintenance LLC, and it generated 203,111 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in Utah, and its capacity factor sits at the 87th percentile of U.S. solar plants. By 2025 generation it ranks 2,473rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

80 MWNameplate capacity
29%Capacity factor, 2025, 87th percentile, on 80 MW net summer
0.5%Of UT generation, 2025
9 yearsAverage generator age, by MW

How hard does the Granite Mountain Solar East, LLC plant run compared with other solar plants?

The Granite Mountain Solar East, LLC plant had a capacity factor of 29% in 2025 on 80 MW of net summer capacity, the 87th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 106 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Granite Mountain Solar East, LLC29%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Granite Mountain Solar East, LLC plant generating more or less than last year?

Generation at Granite Mountain Solar East, LLC fell 3.7% from 2024 to 2025, from 210,979 MWh to 203,111 MWh. Through August 2026 it is running 1.0% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024210,979
2025203,111
2026 through August148,050
2025, same months146,552
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202613,256
July 202621,738
June 202625,292
May 202624,437
April 202620,150
March 202618,647
February 202613,289
January 202611,241
December 202510,010
November 202510,710
October 202517,308
September 202518,531
August 202521,040
July 202524,038
June 202523,092
May 202522,327
April 202516,892
March 202513,050
February 202514,320
January 202511,793
December 202410,571
November 202411,635
October 202415,803
September 202418,731
August 202422,589
July 202423,865
June 202425,361
May 202424,974
April 202421,286
March 202415,543
February 202411,373
January 20249,248

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from the Granite Mountain Solar East, LLC plant?

Granite Mountain Solar East, LLC made 0.5% of the 38,124,679 MWh reported by Utah plants in 2025, from 0.7% of the state's 11,140 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 21st largest of 126 plants in Utah, the 2,965th largest of 14,327 in the U.S. and the 531st largest of 7,223 solar plants. By 2025 generation it is the 29th largest of 117 generating plants in the state.

Granite Mountain Solar East, LLC within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)8011,1400.7%
Generation (MWh)203,11138,124,6790.5%
Solar capacity (MW)803,0372.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Granite Mountain Solar East, LLC plant, and when do they retire?

1 operable generator totals 80 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s180100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GMSEOperatingSolar Photovoltaic802016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Granite Mountain Solar East, LLC plant?

Clearway Energy, Inc is the only joint owner reported for Granite Mountain Solar East, LLC, with 100.0%. Clearway Renewable Operation & Maintenance LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Granite Mountain Solar East, LLC plant?

Granite Mountain Solar East, LLC is in Cedar City, Iron County, Utah, at 37.7751° N, 113.2264° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Utah are similar in size?

Utah has 55 operable solar plants with 3,037 MW of capacity, and Granite Mountain Solar East, LLC's 80 MW is 3% of that.

Solar plants in Utah around this size
PlantCountyMW2025 MWh
Escalante Solar II, LLCBeaver80211,610
Escalante Solar III, LLCBeaver80208,628
Iron Springs Solar, LLCIron80213,555
Granite Mountain Solar East, LLCIron80203,111
Three Peaks PowerIron80225,757
Sigurd Solar LLCSevier80199,973
Clover Creek Solar Community SolarJuab80196,528

Source: EIA Forms EIA-860 and EIA-923, 2025.