Escalante Solar II, LLC is a 80 MW solar power plant in Beaver County, Utah, operated by Clearway Renewable Operation & Maintenance LLC, and it generated 211,610 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Utah, and its capacity factor sits at the 92nd percentile of U.S. solar plants. By 2025 generation it ranks 2,411th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

80 MWNameplate capacity
30%Capacity factor, 2025, 92nd percentile, on 80 MW net summer
0.6%Of UT generation, 2025
9 yearsAverage generator age, by MW

How hard does the Escalante Solar II, LLC plant run compared with other solar plants?

The Escalante Solar II, LLC plant had a capacity factor of 30% in 2025 on 80 MW of net summer capacity, the 92nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 110 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Escalante Solar II, LLC30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Escalante Solar II, LLC plant generating more or less than last year?

Generation at Escalante Solar II, LLC fell 0.2% from 2024 to 2025, from 212,103 MWh to 211,610 MWh. Through August 2026 it is running 4.3% behind the same months of 2025.

Net generation by period
PeriodMWh
2024212,103
2025211,610
2026 through August148,336
2025, same months155,022
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202617,186
July 202617,039
June 202624,631
May 202624,100
April 202620,919
March 202619,997
February 202612,559
January 202611,905
December 20259,511
November 202510,902
October 202517,277
September 202518,898
August 202521,817
July 202524,656
June 202524,931
May 202522,397
April 202520,028
March 202516,778
February 202513,238
January 202511,177
December 20249,959
November 202411,481
October 202416,361
September 202420,021
August 202422,234
July 202424,528
June 202424,689
May 202424,014
April 202421,518
March 202416,084
February 202411,829
January 20249,385

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from the Escalante Solar II, LLC plant?

Escalante Solar II, LLC made 0.6% of the 38,124,679 MWh reported by Utah plants in 2025, from 0.7% of the state's 11,140 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 21st largest of 126 plants in Utah, the 2,965th largest of 14,327 in the U.S. and the 526th largest of 7,223 solar plants. By 2025 generation it is the 24th largest of 117 generating plants in the state.

Escalante Solar II, LLC within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)8011,1400.7%
Generation (MWh)211,61038,124,6790.6%
Solar capacity (MW)803,0372.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Escalante Solar II, LLC plant, and when do they retire?

1 operable generator totals 80 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s180100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ESCS2OperatingSolar Photovoltaic802016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Escalante Solar II, LLC plant?

Clearway Energy, Inc is the only joint owner reported for Escalante Solar II, LLC, with 100.0%. Clearway Renewable Operation & Maintenance LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Escalante Solar II, LLC plant?

Escalante Solar II, LLC is in Milford, Beaver County, Utah, at 38.5008° N, 113.0300° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Utah are similar in size?

Utah has 55 operable solar plants with 3,037 MW of capacity, and Escalante Solar II, LLC's 80 MW is 3% of that.

Solar plants in Utah around this size
PlantCountyMW2025 MWh
Utah Red Hills Renewable Energy ParkIron80207,926
Enterprise Solar, LLCIron80219,349
Escalante Solar I, LLCBeaver80211,535
Escalante Solar II, LLCBeaver80211,610
Escalante Solar III, LLCBeaver80208,628
Iron Springs Solar, LLCIron80213,555
Granite Mountain Solar East, LLCIron80203,111

Source: EIA Forms EIA-860 and EIA-923, 2025.