Solar power plant, Utah

Escalante Solar I, LLC power plant, Utah

Escalante Solar I, LLC is a 80 MW solar power plant in Beaver County, Utah, operated by Clearway Renewable Operation & Maintenance LLC, and it generated 211,535 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.6% of the generation reported in Utah, and its capacity factor sits at the 92nd percentile of U.S. solar plants. By 2025 generation it ranks 2,412th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

80 MWNameplate capacity
30%Capacity factor, 2025, 92nd percentile, on 80 MW net summer
0.6%Of UT generation, 2025
9 yearsAverage generator age, by MW

How hard does the Escalante Solar I, LLC plant run compared with other solar plants?

The Escalante Solar I, LLC plant had a capacity factor of 30% in 2025 on 80 MW of net summer capacity, the 92nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 110 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Escalante Solar I, LLC30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Escalante Solar I, LLC plant generating more or less than last year?

Generation at Escalante Solar I, LLC rose 0.3% from 2024 to 2025, from 210,914 MWh to 211,535 MWh. Through August 2026 it is running 0.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024210,914
2025211,535
2026 through August154,004
2025, same months154,709
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202617,351
July 202622,460
June 202625,560
May 202624,649
April 202621,086
March 202618,848
February 202612,092
January 202611,958
December 20259,723
November 202510,990
October 202517,325
September 202518,788
August 202521,971
July 202524,564
June 202524,898
May 202522,407
April 202519,883
March 202516,682
February 202513,229
January 202511,075
December 20249,791
November 202411,466
October 202416,349
September 202420,007
August 202422,234
July 202424,388
June 202424,427
May 202423,917
April 202421,528
March 202415,498
February 202411,936
January 20249,373

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from the Escalante Solar I, LLC plant?

Escalante Solar I, LLC made 0.6% of the 38,124,679 MWh reported by Utah plants in 2025, from 0.7% of the state's 11,140 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 21st largest of 126 plants in Utah, the 2,965th largest of 14,327 in the U.S. and the 525th largest of 7,223 solar plants. By 2025 generation it is the 25th largest of 117 generating plants in the state.

Escalante Solar I, LLC within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)8011,1400.7%
Generation (MWh)211,53538,124,6790.6%
Solar capacity (MW)803,0372.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Escalante Solar I, LLC plant, and when do they retire?

1 operable generator totals 80 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s180100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ESCS1OperatingSolar Photovoltaic802016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Escalante Solar I, LLC plant?

Clearway Energy, Inc is the only joint owner reported for Escalante Solar I, LLC, with 100.0%. Clearway Renewable Operation & Maintenance LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Escalante Solar I, LLC plant?

Escalante Solar I, LLC is in Milford, Beaver County, Utah, at 38.5242° N, 113.0339° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Utah are similar in size?

Utah has 55 operable solar plants with 3,037 MW of capacity, and Escalante Solar I, LLC's 80 MW is 3% of that.

Solar plants in Utah around this size
PlantCountyMW2025 MWh
Milford Solar 1Beaver99260,650
Utah Red Hills Renewable Energy ParkIron80207,926
Enterprise Solar, LLCIron80219,349
Escalante Solar I, LLCBeaver80211,535
Escalante Solar II, LLCBeaver80211,610
Escalante Solar III, LLCBeaver80208,628
Iron Springs Solar, LLCIron80213,555

Source: EIA Forms EIA-860 and EIA-923, 2025.