Sage Solar I-III power plant, Utah

Sage Solar I-III is a 57.6 MW solar power plant in Rich County, Utah, operated by CI III VK I TE Partnership LLC, and it generated 136,607 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in Utah, and its capacity factor sits at the 77th percentile of U.S. solar plants. By 2025 generation it ranks 3,044th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

57.6 MWNameplate capacity
27%Capacity factor, 2025, 77th percentile, on 57.6 MW net summer
0.4%Of UT generation, 2025
6 yearsAverage generator age, by MW

How hard does the Sage Solar I-III plant run compared with other solar plants?

The Sage Solar I-III plant had a capacity factor of 27% in 2025 on 57.6 MW of net summer capacity, the 77th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 99 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sage Solar I-III27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Sage Solar I-III plant generating more or less than last year?

Generation at Sage Solar I-III fell 2.2% from 2024 to 2025, from 139,620 MWh to 136,607 MWh. Through August 2026 it is running 6.3% behind the same months of 2025.

Net generation by period
PeriodMWh
2024139,620
2025136,607
2026 through August97,615
2025, same months104,187
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202614,083
July 202610,874
June 202618,206
May 202616,512
April 202612,152
March 202611,022
February 20267,887
January 20266,879
December 20254,193
November 20255,396
October 20259,900
September 202512,931
August 202514,881
July 202517,636
June 202518,430
May 202516,618
April 202513,096
March 202510,249
February 20256,728
January 20256,549
December 20244,851
November 20246,585
October 202410,546
September 202414,056
August 202415,858
July 202417,199
June 202416,593
May 202415,404
April 202414,270
March 202411,558
February 20247,517
January 20245,183

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from the Sage Solar I-III plant?

Sage Solar I-III made 0.4% of the 38,124,679 MWh reported by Utah plants in 2025, from 0.5% of the state's 11,140 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 41st largest of 126 plants in Utah, the 3,591st largest of 14,327 in the U.S. and the 825th largest of 7,223 solar plants. By 2025 generation it is the 44th largest of 117 generating plants in the state.

Sage Solar I-III within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)5811,1400.5%
Generation (MWh)136,60738,124,6790.4%
Solar capacity (MW)583,0371.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sage Solar I-III plant, and when do they retire?

1 operable generator totals 57.6 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s158100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
77778OperatingSolar Photovoltaic582019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sage Solar I-III plant?

EIA lists no joint owners for Sage Solar I-III. CI III VK I TE Partnership LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Sage Solar I-III plant?

Sage Solar I-III is in Randolph, Rich County, Utah, at 41.7700° N, 111.0600° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Utah are similar in size?

Utah has 55 operable solar plants with 3,037 MW of capacity, and Sage Solar I-III's 57.6 MW is 2% of that.

Solar plants in Utah around this size
PlantCountyMW2025 MWh
Horseshoe Solar, LLCTooele75195,821
Red Mesa Solar ProjectSan Juan72188,362
Cove Mountain SolarIron58158,955
Sage Solar I-IIIRich58136,607
Granite Mountain Solar West, LLCIron50125,158
Pavant Solar, LLCMillard50114,348
Pavant Solar II LLCMillard5085,894

Source: EIA Forms EIA-860 and EIA-923, 2025.