Solar power plant, Virginia
Grasshopper Solar power plant, Virginia
Grasshopper Solar is a 80 MW solar power plant in Mecklenburg County, Virginia, operated by Dominion Energy Inc., and it generated 122,467 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Virginia, and its capacity factor sits at the 16th percentile of U.S. solar plants. By 2025 generation it ranks 3,177th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Grasshopper Solar plant run compared with other solar plants?
The Grasshopper Solar plant had a capacity factor of 17% in 2025 on 80 MW of net summer capacity, the 16th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 64 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Grasshopper Solar | 17% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Grasshopper Solar plant generating more or less than last year?
Generation at Grasshopper Solar fell 2.5% from 2024 to 2025, from 125,635 MWh to 122,467 MWh. Through August 2026 it is running 2.7% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 125,635 |
| 2025 | 122,467 |
| 2026 through August | 92,861 |
| 2025, same months | 90,414 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 13,737 |
| July 2026 | 13,205 |
| June 2026 | 15,823 |
| May 2026 | 13,971 |
| April 2026 | 13,244 |
| March 2026 | 11,704 |
| February 2026 | 6,554 |
| January 2026 | 4,623 |
| December 2025 | 4,714 |
| November 2025 | 7,558 |
| October 2025 | 9,599 |
| September 2025 | 10,182 |
| August 2025 | 11,599 |
| July 2025 | 13,456 |
| June 2025 | 14,593 |
| May 2025 | 12,980 |
| April 2025 | 12,489 |
| March 2025 | 11,955 |
| February 2025 | 6,909 |
| January 2025 | 6,433 |
| December 2024 | 5,494 |
| November 2024 | 6,673 |
| October 2024 | 10,734 |
| September 2024 | 9,763 |
| August 2024 | 13,321 |
| July 2024 | 13,505 |
| June 2024 | 15,490 |
| May 2024 | 13,001 |
| April 2024 | 12,619 |
| March 2024 | 10,838 |
| February 2024 | 8,081 |
| January 2024 | 6,116 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Grasshopper Solar plant, and when do they retire?
1 operable generator totals 80 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 80 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GRHS | Operating | Solar Photovoltaic | 80 | 2020 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Grasshopper Solar plant?
EIA lists no joint owners for Grasshopper Solar. Dominion Energy Inc. operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Grasshopper Solar plant?
Grasshopper Solar is in Chase City, Mecklenburg County, Virginia, at 36.8500° N, 78.4500° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Virginia are similar in size?
Virginia has 141 operable solar plants with 5,163 MW of capacity, and Grasshopper Solar's 80 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Foxhound | Halifax | 83 | 155,873 |
| Eastern Shore Solar, LLC | Accomack | 80 | 157,913 |
| Piney Creek Solar | Halifax | 80 | 153,471 |
| Grasshopper Solar | Mecklenburg | 80 | 122,467 |
| Water Strider Solar | Halifax | 80 | 162,948 |
| Greensville County Solar Project, LLC | Greensville | 80 | 138,886 |
| Altavista Solar | Campbell | 80 | 159,449 |
Source: EIA Forms EIA-860 and EIA-923, 2025.