Skip to main content
RateWatt

Solar power plant, Virginia

Greensville County Solar Project, LLC power plant, Virginia

Greensville County Solar Project, LLC is a 80 MW solar power plant in Greensville County, Virginia, operated by Dominion Energy Inc., and it generated 138,886 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Virginia, and its capacity factor sits at the 24th percentile of U.S. solar plants. By 2025 generation it ranks 3,020th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

80 MWNameplate capacity
20%Capacity factor, 2025, 24th percentile, on 80 MW net summer
0.1%Of VA generation, 2025
5 yearsAverage generator age, by MW

How hard does the Greensville County Solar Project, LLC plant run compared with other solar plants?

The Greensville County Solar Project, LLC plant had a capacity factor of 20% in 2025 on 80 MW of net summer capacity, the 24th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 72 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Greensville County Solar Project, LLC20%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Greensville County Solar Project, LLC plant generating more or less than last year?

Generation at Greensville County Solar Project, LLC rose 2.5% from 2024 to 2025, from 135,545 MWh to 138,886 MWh. Through August 2026 it is running 13.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024135,545
2025138,886
2026 through August114,115
2025, same months100,941
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202616,096
July 202616,059
June 202618,479
May 202616,198
April 202616,829
March 202614,310
February 20268,553
January 20267,591
December 20256,535
November 20259,209
October 202511,164
September 202511,037
August 202514,156
July 202518,474
June 202516,824
May 202513,120
April 202512,516
March 20259,136
February 20258,134
January 20258,581
December 20246,777
November 20247,609
October 202412,078
September 202410,495
August 202415,394
July 202414,724
June 202418,098
May 202413,052
April 202412,452
March 202411,634
February 20248,616
January 20244,616

Source: EIA Form EIA-923, through August 2026.

How much of Virginia's electricity comes from the Greensville County Solar Project, LLC plant?

Greensville County Solar Project, LLC made 0.1% of the 106,220,859 MWh reported by Virginia plants in 2025, from 0.3% of the state's 31,312 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 55th largest of 259 plants in Virginia, the 2,965th largest of 14,327 in the U.S. and the 542nd largest of 7,223 solar plants. By 2025 generation it is the 60th largest of 241 generating plants in the state.

Greensville County Solar Project, LLC within Virginia, 2025
MeasureThis plantVirginiaShare
Capacity (MW)8031,3120.3%
Generation (MWh)138,886106,220,8590.1%
Solar capacity (MW)805,1631.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Greensville County Solar Project, LLC plant, and when do they retire?

1 operable generator totals 80 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s180100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GVSOOperatingSolar Photovoltaic802020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Greensville County Solar Project, LLC plant?

EIA lists no joint owners for Greensville County Solar Project, LLC. Dominion Energy Inc. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Greensville County Solar Project, LLC plant?

Greensville County Solar Project, LLC is in Skippers, Greensville County, Virginia, at 36.6400° N, 77.5700° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Virginia are similar in size?

Virginia has 141 operable solar plants with 5,163 MW of capacity, and Greensville County Solar Project, LLC's 80 MW is 2% of that.

Solar plants in Virginia around this size
PlantCountyMW2025 MWh
Piney Creek SolarHalifax80153,471
Grasshopper SolarMecklenburg80122,467
Water Strider SolarHalifax80162,948
Greensville County Solar Project, LLCGreensville80138,886
Altavista SolarCampbell80159,449
Fountain Creek SolarGreensville80131,709
Pleinmont Solar 1Spotsylvania75141,653

Source: EIA Forms EIA-860 and EIA-923, 2025.