Solar power plant, Virginia

Pleinmont Solar 1 power plant, Virginia

Pleinmont Solar 1 is a 75 MW solar power plant in Spotsylvania County, Virginia, operated by AES Distributed Energy, and it generated 141,653 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Virginia, and its capacity factor sits at the 38th percentile of U.S. solar plants. By 2025 generation it ranks 2,995th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

75 MWNameplate capacity
22%Capacity factor, 2025, 38th percentile, on 75 MW net summer
0.1%Of VA generation, 2025
5 yearsAverage generator age, by MW

How hard does the Pleinmont Solar 1 plant run compared with other solar plants?

The Pleinmont Solar 1 plant had a capacity factor of 22% in 2025 on 75 MW of net summer capacity, the 38th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 79 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pleinmont Solar 122%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Pleinmont Solar 1 plant generating more or less than last year?

Generation at Pleinmont Solar 1 rose 1.6% from 2024 to 2025, from 139,437 MWh to 141,653 MWh. Through August 2026 it is running 1.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024139,437
2025141,653
2026 through August107,414
2025, same months105,464
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202614,378
July 202615,670
June 202617,411
May 202616,225
April 202615,196
March 202612,344
February 20268,768
January 20267,422
December 20255,467
November 20258,049
October 202510,580
September 202512,093
August 202514,253
July 202516,296
June 202515,709
May 202514,543
April 202514,106
March 202513,953
February 20258,459
January 20258,145
December 20245,975
November 20247,679
October 202410,135
September 20246,201
August 202415,831
July 202416,531
June 202418,527
May 202414,993
April 202414,070
March 202412,865
February 202410,075
January 20246,555

Source: EIA Form EIA-923, through August 2026.

How much of Virginia's electricity comes from the Pleinmont Solar 1 plant?

Pleinmont Solar 1 made 0.1% of the 106,220,859 MWh reported by Virginia plants in 2025, from 0.2% of the state's 31,312 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 62nd largest of 259 plants in Virginia, the 3,097th largest of 14,327 in the U.S. and the 582nd largest of 7,223 solar plants. By 2025 generation it is the 59th largest of 241 generating plants in the state.

Pleinmont Solar 1 within Virginia, 2025
MeasureThis plantVirginiaShare
Capacity (MW)7531,3120.2%
Generation (MWh)141,653106,220,8590.1%
Solar capacity (MW)755,1631.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Pleinmont Solar 1 plant, and when do they retire?

1 operable generator totals 75 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PLNM1OperatingSolar Photovoltaic752020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Pleinmont Solar 1 plant?

EIA lists no joint owners for Pleinmont Solar 1. AES Distributed Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Pleinmont Solar 1 plant?

Pleinmont Solar 1 is in Spotsylvania, Spotsylvania County, Virginia, at 38.2471° N, 77.7862° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Virginia are similar in size?

Virginia has 141 operable solar plants with 5,163 MW of capacity, and Pleinmont Solar 1's 75 MW is 1% of that.

Solar plants in Virginia around this size
PlantCountyMW2025 MWh
Greensville County Solar Project, LLCGreensville80138,886
Altavista SolarCampbell80159,449
Fountain Creek SolarGreensville80131,709
Pleinmont Solar 1Spotsylvania75141,653
Wythe County SolarWythe75119,139
Alton Post Office SolarHalifax75136,967
Foxglove SolarFrederick75125,844

Source: EIA Forms EIA-860 and EIA-923, 2025.