Fountain Creek Solar is a 80 MW solar power plant in Greensville County, Virginia, operated by Dominion Energy Inc., and it generated 131,709 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Virginia, and its capacity factor sits at the 19th percentile of U.S. solar plants. By 2025 generation it ranks 3,091st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

80 MWNameplate capacity
19%Capacity factor, 2025, 19th percentile, on 80 MW net summer
0.1%Of VA generation, 2025
1 yearAverage generator age, by MW

How hard does the Fountain Creek Solar plant run compared with other solar plants?

The Fountain Creek Solar plant had a capacity factor of 19% in 2025 on 80 MW of net summer capacity, the 19th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 69 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Fountain Creek Solar19%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Fountain Creek Solar plant generating more or less than last year?

Fountain Creek Solar generated 131,709 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 12.2% ahead of the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.

Net generation by period
PeriodMWh
2024934
2025131,709
2026 through August108,502
2025, same months96,735
Monthly generation, Dec 2024 to Aug 2026
MonthMWh
August 202612,885
July 202615,903
June 202617,899
May 202617,291
April 202615,346
March 202613,802
February 20268,429
January 20266,947
December 20255,760
November 20259,208
October 20258,679
September 202511,327
August 202514,310
July 202517,148
June 202517,984
May 202512,137
April 202516,536
March 202510,320
February 20256,905
January 20251,395
December 2024934

Source: EIA Form EIA-923, through August 2026.

How much of Virginia's electricity comes from the Fountain Creek Solar plant?

Fountain Creek Solar made 0.1% of the 106,220,859 MWh reported by Virginia plants in 2025, from 0.3% of the state's 31,312 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 55th largest of 259 plants in Virginia, the 2,965th largest of 14,327 in the U.S. and the 565th largest of 7,223 solar plants. By 2025 generation it is the 62nd largest of 241 generating plants in the state.

Fountain Creek Solar within Virginia, 2025
MeasureThis plantVirginiaShare
Capacity (MW)8031,3120.3%
Generation (MWh)131,709106,220,8590.1%
Solar capacity (MW)805,1631.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Fountain Creek Solar plant, and when do they retire?

1 operable generator totals 80 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s180100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
FTCROperatingSolar Photovoltaic802024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Fountain Creek Solar plant?

EIA lists no joint owners for Fountain Creek Solar. Dominion Energy Inc. operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Fountain Creek Solar plant?

Fountain Creek Solar is in Skippers, Greensville County, Virginia, at 36.5900° N, 77.6700° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Virginia are similar in size?

Virginia has 141 operable solar plants with 5,163 MW of capacity, and Fountain Creek Solar's 80 MW is 2% of that.

Solar plants in Virginia around this size
PlantCountyMW2025 MWh
Water Strider SolarHalifax80162,948
Greensville County Solar Project, LLCGreensville80138,886
Altavista SolarCampbell80159,449
Fountain Creek SolarGreensville80131,709
Pleinmont Solar 1Spotsylvania75141,653
Wythe County SolarWythe75119,139
Alton Post Office SolarHalifax75136,967

Source: EIA Forms EIA-860 and EIA-923, 2025.