Alton Post Office Solar is a 75 MW solar power plant in Halifax County, Virginia, operated by Urban Grid Solar, and it generated 136,967 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Virginia, and its capacity factor sits at the 32nd percentile of U.S. solar plants. By 2025 generation it ranks 3,042nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

75 MWNameplate capacity
21%Capacity factor, 2025, 32nd percentile, on 75 MW net summer
0.1%Of VA generation, 2025
1 yearAverage generator age, by MW

How hard does the Alton Post Office Solar plant run compared with other solar plants?

The Alton Post Office Solar plant had a capacity factor of 21% in 2025 on 75 MW of net summer capacity, the 32nd percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 76 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Alton Post Office Solar21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Alton Post Office Solar plant generating more or less than last year?

Alton Post Office Solar generated 136,967 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 2.6% ahead of the same months of 2025. 2024 has output for only 1 month, so the two years are not compared.

Net generation by period
PeriodMWh
20242,214
2025136,967
2026 through August106,876
2025, same months104,153
Monthly generation, Dec 2024 to Aug 2026
MonthMWh
August 202614,460
July 202614,990
June 202618,629
May 202617,203
April 202616,822
March 202611,510
February 20265,601
January 20267,661
December 20255,859
November 20258,801
October 20258,153
September 202510,001
August 202513,704
July 202516,539
June 202518,302
May 202514,435
April 202515,001
March 202512,731
February 20257,021
January 20256,420
December 20242,214

Source: EIA Form EIA-923, through August 2026.

How much of Virginia's electricity comes from the Alton Post Office Solar plant?

Alton Post Office Solar made 0.1% of the 106,220,859 MWh reported by Virginia plants in 2025, from 0.2% of the state's 31,312 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 62nd largest of 259 plants in Virginia, the 3,097th largest of 14,327 in the U.S. and the 593rd largest of 7,223 solar plants. By 2025 generation it is the 61st largest of 241 generating plants in the state.

Alton Post Office Solar within Virginia, 2025
MeasureThis plantVirginiaShare
Capacity (MW)7531,3120.2%
Generation (MWh)136,967106,220,8590.1%
Solar capacity (MW)755,1631.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Alton Post Office Solar plant, and when do they retire?

1 operable generator totals 75 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s175100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ALPT1OperatingSolar Photovoltaic752024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Alton Post Office Solar plant?

EIA lists no joint owners for Alton Post Office Solar. Urban Grid Solar operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Alton Post Office Solar plant?

Alton Post Office Solar is in Alton, Halifax County, Virginia, at 36.5689° N, 79.0329° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Virginia are similar in size?

Virginia has 141 operable solar plants with 5,163 MW of capacity, and Alton Post Office Solar's 75 MW is 1% of that.

Solar plants in Virginia around this size
PlantCountyMW2025 MWh
Fountain Creek SolarGreensville80131,709
Pleinmont Solar 1Spotsylvania75141,653
Wythe County SolarWythe75119,139
Alton Post Office SolarHalifax75136,967
Foxglove SolarFrederick75125,844
Powells Creek Solar - HybridHalifax70152,232
Bedford Solar (Dominion)Chesapeake City70119,501