Wind power plant, Texas
Green Pastures Wind I power plant, Texas
Green Pastures Wind I is a 150 MW wind power plant in Baylor County, Texas, operated by Green Pastures Wind I, LLC, and it generated 255,605 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 10th percentile of U.S. wind plants. By 2025 generation it ranks 2,191st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Green Pastures Wind I plant run compared with other wind plants?
The Green Pastures Wind I plant had a capacity factor of 19% in 2025 on 150 MW of net summer capacity, the 10th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 71 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Green Pastures Wind I | 19% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Green Pastures Wind I plant generating more or less than last year?
Generation at Green Pastures Wind I fell 7.9% from 2024 to 2025, from 277,548 MWh to 255,605 MWh.
| Period | MWh |
|---|---|
| 2024 | 277,548 |
| 2025 | 255,605 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 29,727 |
| November 2025 | 21,886 |
| October 2025 | 23,646 |
| September 2025 | 17,639 |
| August 2025 | 17,302 |
| July 2025 | 22,173 |
| June 2025 | 21,146 |
| May 2025 | 14,535 |
| April 2025 | 32,933 |
| March 2025 | 20,530 |
| February 2025 | 20,018 |
| January 2025 | 14,070 |
| December 2024 | 27,149 |
| November 2024 | 26,498 |
| October 2024 | 28,494 |
| September 2024 | 15,621 |
| August 2024 | 19,278 |
| July 2024 | 23,070 |
| June 2024 | 23,023 |
| May 2024 | 22,683 |
| April 2024 | 31,483 |
| March 2024 | 29,660 |
| February 2024 | 20,847 |
| January 2024 | 9,742 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Green Pastures Wind I plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GPI | Operating | Onshore Wind Turbine | 150 | 2015 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Green Pastures Wind I plant?
Acciona Energy USA Global, LLC is the only joint owner reported for Green Pastures Wind I, with 100.0%. Green Pastures Wind I, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Green Pastures Wind I plant?
Green Pastures Wind I is in Seymour, Baylor County, Texas, at 33.6282° N, 99.4112° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Green Pastures Wind I's 150 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Senate Wind LLC | Jack | 150 | 393,732 |
| Goldthwaite Wind Energy Facility | Mills | 150 | 408,631 |
| Route 66 Wind Plant | Carson | 150 | 552,481 |
| Green Pastures Wind I | Baylor | 150 | 255,605 |
| Green Pastures Wind II | Knox | 150 | 298,081 |
| Briscoe Wind Farm | Briscoe | 150 | 420,754 |
| Wildcat Ranch Wind Project | Cochran | 150 | 651,907 |
Source: EIA Forms EIA-860 and EIA-923, 2025.