Wind power plant, Texas
Green Pastures Wind II power plant, Texas
Green Pastures Wind II is a 150 MW wind power plant in Knox County, Texas, operated by Green Pastures Wind II, LLC, and it generated 298,081 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Texas, and its capacity factor sits at the 16th percentile of U.S. wind plants. By 2025 generation it ranks 1,982nd of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Green Pastures Wind II plant run compared with other wind plants?
The Green Pastures Wind II plant had a capacity factor of 23% in 2025 on 150 MW of net summer capacity, the 16th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 83 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Green Pastures Wind II | 23% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Green Pastures Wind II plant generating more or less than last year?
Generation at Green Pastures Wind II rose 2.4% from 2024 to 2025, from 291,083 MWh to 298,081 MWh.
| Period | MWh |
|---|---|
| 2024 | 291,083 |
| 2025 | 298,081 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 33,468 |
| November 2025 | 37,798 |
| October 2025 | 33,738 |
| September 2025 | 18,381 |
| August 2025 | 17,411 |
| July 2025 | 23,967 |
| June 2025 | 29,560 |
| May 2025 | 19,404 |
| April 2025 | 32,214 |
| March 2025 | 16,559 |
| February 2025 | 20,398 |
| January 2025 | 15,183 |
| December 2024 | 26,412 |
| November 2024 | 12,033 |
| October 2024 | 20,727 |
| September 2024 | 13,457 |
| August 2024 | 18,730 |
| July 2024 | 21,168 |
| June 2024 | 26,684 |
| May 2024 | 27,111 |
| April 2024 | 39,277 |
| March 2024 | 35,947 |
| February 2024 | 33,792 |
| January 2024 | 15,745 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Green Pastures Wind II plant, and when do they retire?
1 operable generator totals 150 MW, with an average age of 10 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 150 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GPII | Operating | Onshore Wind Turbine | 150 | 2015 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Green Pastures Wind II plant?
Acciona Energy USA Global, LLC is the only joint owner reported for Green Pastures Wind II, with 100.0%. Green Pastures Wind II, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Green Pastures Wind II plant?
Green Pastures Wind II is in Seymour, Knox County, Texas, at 33.6460° N, 99.5329° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Texas are similar in size?
Texas has 228 operable wind plants with 43,942 MW of capacity, and Green Pastures Wind II's 150 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Goldthwaite Wind Energy Facility | Mills | 150 | 408,631 |
| Route 66 Wind Plant | Carson | 150 | 552,481 |
| Green Pastures Wind I | Baylor | 150 | 255,605 |
| Green Pastures Wind II | Knox | 150 | 298,081 |
| Briscoe Wind Farm | Briscoe | 150 | 420,754 |
| Wildcat Ranch Wind Project | Cochran | 150 | 651,907 |
| La Casa Wind | Stephens | 150 | 55,436 |
Source: EIA Forms EIA-860 and EIA-923, 2025.