Green River Wind Farm is a 194 MW wind power plant in Lee County, Illinois, operated by Geronimo Power, and it generated 497,093 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in Illinois, and its capacity factor sits at the 36th percentile of U.S. wind plants. By 2025 generation it ranks 1,347th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

194 MWNameplate capacity
29%Capacity factor, 2025, 36th percentile, on 194 MW net summer
0.3%Of IL generation, 2025
6 yearsAverage generator age, by MW

How hard does the Green River Wind Farm plant run compared with other wind plants?

The Green River Wind Farm plant had a capacity factor of 29% in 2025 on 194 MW of net summer capacity, the 36th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 107 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Green River Wind Farm29%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Green River Wind Farm plant generating more or less than last year?

Generation at Green River Wind Farm fell 8.8% from 2024 to 2025, from 545,231 MWh to 497,093 MWh. Through August 2026 it is running 2.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024545,231
2025497,093
2026 through August339,638
2025, same months332,714
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202618,605
July 202611,694
June 202635,948
May 202641,544
April 202665,688
March 202664,674
February 202645,458
January 202656,027
December 202552,046
November 202549,754
October 202544,919
September 202517,660
August 202516,203
July 202514,617
June 202528,738
May 202537,785
April 202557,266
March 202570,871
February 202547,517
January 202559,717
December 202453,717
November 202457,028
October 202453,697
September 202417,954
August 202418,932
July 202414,881
June 202442,444
May 202446,571
April 202469,393
March 202471,014
February 202452,216
January 202447,384

Source: EIA Form EIA-923, through August 2026.

How much of Illinois' electricity comes from the Green River Wind Farm plant?

Green River Wind Farm made 0.3% of the 191,710,915 MWh reported by Illinois plants in 2025, from 0.4% of the state's 52,515 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 69th largest of 602 plants in Illinois, the 1,679th largest of 14,327 in the U.S. and the 347th largest of 1,358 wind plants. By 2025 generation it is the 48th largest of 531 generating plants in the state.

Green River Wind Farm within Illinois, 2025
MeasureThis plantIllinoisShare
Capacity (MW)19452,5150.4%
Generation (MWh)497,093191,710,9150.3%
Wind capacity (MW)1948,4582.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Green River Wind Farm plant, and when do they retire?

1 operable generator totals 194 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1194100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GRNRVOperatingOnshore Wind Turbine1942019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Green River Wind Farm plant?

EIA lists no joint owners for Green River Wind Farm. Geronimo Power operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Green River Wind Farm plant?

Green River Wind Farm is in Deer Grove, Lee County, Illinois, at 41.6203° N, 89.5570° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Illinois are similar in size?

Illinois has 55 operable wind plants with 8,458 MW of capacity, and Green River Wind Farm's 194 MW is 2% of that.

Wind plants in Illinois around this size
PlantCountyMW2025 MWh
Blackstone Wind Farm II LLCLivingston200481,538
Minonk Wind FarmWoodford200622,918
Bishop Hill Energy LLCHenry200713,325
Green River Wind FarmLee194497,093
Hilltopper Wind ProjectLogan185473,987
Glacier Sands Wind Power, LLCMason185632,305
Kelly Creek Wind ProjectFord184621,703

Source: EIA Forms EIA-860 and EIA-923, 2025.