Hilltopper Wind Project, Illinois

Hilltopper Wind Project is a 185 MW wind power plant in Logan County, Illinois, operated by Hilltopper Wind Project, LLC, and it generated 473,987 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Illinois, and its capacity factor sits at the 36th percentile of U.S. wind plants. By 2025 generation it ranks 1,396th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

185 MWNameplate capacity
29%Capacity factor, 2025, 36th percentile, on 185 MW net summer
0.2%Of IL generation, 2025
7 yearsAverage generator age, by MW

How hard does the Hilltopper Wind Project plant run compared with other wind plants?

The Hilltopper Wind Project plant had a capacity factor of 29% in 2025 on 185 MW of net summer capacity, the 36th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 107 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hilltopper Wind Project29%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hilltopper Wind Project plant generating more or less than last year?

Generation at Hilltopper Wind Project fell 10.9% from 2024 to 2025, from 532,072 MWh to 473,987 MWh. Through August 2026 it is running 7.2% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024532,072
2025473,987
2026 through August347,343
2025, same months323,952
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202617,211
July 202614,472
June 202633,052
May 202640,738
April 202669,202
March 202667,954
February 202646,960
January 202657,754
December 202553,441
November 202552,393
October 202533,789
September 202510,412
August 202514,565
July 202514,761
June 202524,401
May 202538,627
April 202556,296
March 202572,149
February 202551,481
January 202551,672
December 202448,748
November 202453,919
October 202445,945
September 202417,498
August 202419,761
July 202418,169
June 202437,016
May 202438,802
April 202462,935
March 202475,163
February 202459,865
January 202454,251

Source: EIA Form EIA-923, through August 2026.

How much of Illinois' electricity comes from the Hilltopper Wind Project plant?

Hilltopper Wind Project made 0.2% of the 191,710,915 MWh reported by Illinois plants in 2025, from 0.4% of the state's 52,515 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 71st largest of 602 plants in Illinois, the 1,717th largest of 14,327 in the U.S. and the 354th largest of 1,358 wind plants. By 2025 generation it is the 51st largest of 531 generating plants in the state.

Hilltopper Wind Project within Illinois, 2025
MeasureThis plantIllinoisShare
Capacity (MW)18552,5150.4%
Generation (MWh)473,987191,710,9150.2%
Wind capacity (MW)1858,4582.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hilltopper Wind Project plant, and when do they retire?

1 operable generator totals 185 MW, with an average age of 7 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1185100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WT1OperatingOnshore Wind Turbine1852018n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hilltopper Wind Project plant?

EIA lists no joint owners for Hilltopper Wind Project. Hilltopper Wind Project, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Hilltopper Wind Project plant?

Hilltopper Wind Project is in Mt. Pulaski, Logan County, Illinois, at 40.0300° N, 89.3810° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Illinois are similar in size?

Illinois has 55 operable wind plants with 8,458 MW of capacity, and Hilltopper Wind Project's 185 MW is 2% of that.

Wind plants in Illinois around this size
PlantCountyMW2025 MWh
Minonk Wind FarmWoodford200622,918
Bishop Hill Energy LLCHenry200713,325
Green River Wind FarmLee194497,093
Hilltopper Wind ProjectLogan185473,987
Glacier Sands Wind Power, LLCMason185632,305
Kelly Creek Wind ProjectFord184621,703
Pilot Hill Wind FarmKankakee175588,568

Source: EIA Forms EIA-860 and EIA-923, 2025.