Solar power plant, Illinois

High Point Solar LLC power plant, Illinois

High Point Solar LLC is a 100 MW solar power plant in Stephenson County, Illinois, operated by Acciona Energy USA Global, LLC, and it generated 193,239 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Illinois, and its capacity factor sits at the 41st percentile of U.S. solar plants. By 2025 generation it ranks 2,542nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

100 MWNameplate capacity
22%Capacity factor, 2025, 41st percentile, on 100 MW net summer
0.1%Of IL generation, 2025
2 yearsAverage generator age, by MW

How hard does the High Point Solar LLC plant run compared with other solar plants?

The High Point Solar LLC plant had a capacity factor of 22% in 2025 on 100 MW of net summer capacity, the 41st percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 81 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
High Point Solar LLC22%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the High Point Solar LLC plant generating more or less than last year?

Generation at High Point Solar LLC rose 11.1% from 2024 to 2025, from 173,930 MWh to 193,239 MWh. Through August 2026 it is running 17.4% behind the same months of 2025.

Net generation by period
PeriodMWh
2024173,930
2025193,239
2026 through August120,279
2025, same months145,662
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202616,908
July 202626,075
June 202623,536
May 202612,080
April 20267,495
March 202616,131
February 202611,420
January 20266,634
December 20256,479
November 20258,203
October 202512,273
September 202520,622
August 202523,312
July 202522,920
June 202523,024
May 202522,971
April 202517,371
March 202514,365
February 202511,756
January 20259,943
December 20245,407
November 20245,651
October 202412,859
September 202418,657
August 202415,371
July 202421,148
June 202418,995
May 202421,577
April 202418,815
March 202416,485
February 202414,152
January 20244,813

Source: EIA Form EIA-923, through August 2026.

How much of Illinois' electricity comes from the High Point Solar LLC plant?

High Point Solar LLC made 0.1% of the 191,710,915 MWh reported by Illinois plants in 2025, from 0.2% of the state's 52,515 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 104th largest of 602 plants in Illinois, the 2,602nd largest of 14,327 in the U.S. and the 454th largest of 7,223 solar plants. By 2025 generation it is the 88th largest of 531 generating plants in the state.

High Point Solar LLC within Illinois, 2025
MeasureThis plantIllinoisShare
Capacity (MW)10052,5150.2%
Generation (MWh)193,239191,710,9150.1%
Solar capacity (MW)1004,3872.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the High Point Solar LLC plant, and when do they retire?

1 operable generator totals 100 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s1100100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
HPSOperatingSolar Photovoltaic1002023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the High Point Solar LLC plant?

EIA lists no joint owners for High Point Solar LLC. Acciona Energy USA Global, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the High Point Solar LLC plant?

High Point Solar LLC is in Lena, Stephenson County, Illinois, at 42.4329° N, 89.9069° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Illinois are similar in size?

Illinois has 406 operable solar plants with 4,387 MW of capacity, and High Point Solar LLC's 100 MW is 2% of that.

Solar plants in Illinois around this size
PlantCountyMW2025 MWh
Wolf Run SolarMorgan140314,470
Eldorado Solar IISaline12039,394
Hickory SolarJersey110249,702
High Point Solar LLCStephenson100193,239
Prairie State Solar ProjectPerry99220,366
Dressor Plains Solar, LLCFayette99232,080
Mulligan Solar, LLCLogan70156,344

Source: EIA Forms EIA-860 and EIA-923, 2025.