Solar power plant, Illinois

Prairie State Solar Project, Illinois

Prairie State Solar Project is a 99 MW solar power plant in Perry County, Illinois, operated by Prairie State Solar, LLC, and it generated 220,366 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Illinois, and its capacity factor sits at the 67th percentile of U.S. solar plants. By 2025 generation it ranks 2,364th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

99 MWNameplate capacity
25%Capacity factor, 2025, 67th percentile, on 99 MW net summer
0.1%Of IL generation, 2025
4 yearsAverage generator age, by MW

How hard does the Prairie State Solar Project plant run compared with other solar plants?

The Prairie State Solar Project plant had a capacity factor of 25% in 2025 on 99 MW of net summer capacity, the 67th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 93 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Prairie State Solar Project25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Prairie State Solar Project plant generating more or less than last year?

Generation at Prairie State Solar Project fell 5.9% from 2024 to 2025, from 234,102 MWh to 220,366 MWh. Through August 2026 it is running 0.8% behind the same months of 2025.

Net generation by period
PeriodMWh
2024234,102
2025220,366
2026 through August165,473
2025, same months166,806
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202625,924
July 202621,326
June 202626,170
May 202620,240
April 202622,930
March 202619,725
February 202615,790
January 202613,368
December 20258,956
November 20258,372
October 202513,483
September 202522,749
August 202527,970
July 202526,390
June 202524,299
May 202523,029
April 202519,099
March 202521,104
February 202511,397
January 202513,518
December 20248,333
November 202411,097
October 202422,153
September 202418,437
August 202426,035
July 202425,859
June 202427,987
May 202425,263
April 202422,041
March 202421,280
February 202416,613
January 20249,004

Source: EIA Form EIA-923, through August 2026.

How much of Illinois' electricity comes from the Prairie State Solar Project plant?

Prairie State Solar Project made 0.1% of the 191,710,915 MWh reported by Illinois plants in 2025, from 0.2% of the state's 52,515 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 105th largest of 602 plants in Illinois, the 2,738th largest of 14,327 in the U.S. and the 498th largest of 7,223 solar plants. By 2025 generation it is the 84th largest of 531 generating plants in the state.

Prairie State Solar Project within Illinois, 2025
MeasureThis plantIllinoisShare
Capacity (MW)9952,5150.2%
Generation (MWh)220,366191,710,9150.1%
Solar capacity (MW)994,3872.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Prairie State Solar Project plant, and when do they retire?

1 operable generator totals 99 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s199100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PSS01OperatingSolar Photovoltaic992021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Prairie State Solar Project plant?

EIA lists no joint owners for Prairie State Solar Project. Prairie State Solar, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Prairie State Solar Project plant?

Prairie State Solar Project is in Swanwick Township, Perry County, Illinois, at 38.2083° N, 89.5792° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in Illinois are similar in size?

Illinois has 406 operable solar plants with 4,387 MW of capacity, and Prairie State Solar Project's 99 MW is 2% of that.

Solar plants in Illinois around this size
PlantCountyMW2025 MWh
Eldorado Solar IISaline12039,394
Hickory SolarJersey110249,702
High Point Solar LLCStephenson100193,239
Prairie State Solar ProjectPerry99220,366
Dressor Plains Solar, LLCFayette99232,080
Mulligan Solar, LLCLogan70156,344
Baldwin Solar BESSRandolph68139,904

Source: EIA Forms EIA-860 and EIA-923, 2025.